Watershed - Middle Fox River - Illinois (FX04)
Middle Fox River - Illinois Watershed

Details

The Middle Fox River Watershed is the largest of the Fox River Basin watersheds (248 square miles), encompassing portions of Racine and Waukesha Counties, along with a very small portion of Walworth County. Portions of the Cities of Burlington, Muskego, New Berlin and Waukesha lie within the watershed, along with the Villages of Big Bend, Mukwonago, North Prairie, Rochester, Wales and Waterford. Land cover in the watershed is primarily rural, with agricultural (41%). Other rural uses include grasslands (18%), wetlands (14%) and forests (13%). Urban areas comprise nearly four percent of the land cover in the watershed . The entire stretch of the Fox River that runs through the watershed is listed as impaired from phosphorus deposition, sediment/total suspended solids and polychlorinated biphenyls (PCBs), which are a class of compounds used in a wide variety of manufacturing processes and in transformers. The use of PCBs in new applications is no longer possible, but historical discharges or dumping of PCBs throughout the U.S. has resulted in contamination of river bottoms where PCBs attach to sediment or soil and is redistributed when the sediment is disrupted or disturbed. Organic contaminants are bio accumulating substances, which mean that they are stored in the fat of animals, such as fish, and transferred to predators, such as humans. A portion of the White River and all of Wind, Little Muskego and Tichigan Lakes are considered impaired due to total phosphorus. Phosphorus has long been recognized as the controlling factor in plant and algae growth in Wisconsin lakes and streams. Small increases in phosphorus can fuel substantial increases in aquatic plant and algae growth, which in turn can reduce recreational use, property values, and public health The main impacts to streams in this watershed include agricultural, development, sedimentation, channelization, elevated temperatures and stormwater runoff. It is recommended that dam removal and habitat improvements be implemented to improve existing conditions. Where practical, habitat restoration and buffer implementation should be employed to provide multiple benefits including bank stabilization, water quality, fisheries, reduced sedimentation and nutrient loading.

Date  2014

Ecological Landscapes for Middle Fox River - Illinois Watershed

Ecological Landscapes

The Middle Fox River - Illinois watershed is located primarily in the Southern Lake Michigan Coastal Ecological Landscape, in the southeastern corner of Wisconsin along Lake Michigan. The landforms in this Ecological Landscape are characteristic of glacial lake influence, with ridge and swale topography, clay bluffs, and lake plain along Lake Michigan. Further inland, ground moraine is the dominant landform. Soils typically have a silt-loam surface overlying loamy and clayey tills. The historic vegetation in the northern part of this Ecological Landscape was dominated by sugar maple-basswood-beech forests with some oak while the southern part was dominated by oak forest, oak savanna and prairies. Wet, wet-mesic, and lake plain prairies were common in this area. Black ash and relict cedar and tamarack swamps were found in this Ecological Landscape. Today, most of the area is dominated by dairy and cash grain agriculture and intense urban development. Only about 8% of the Ecological Landscape is forested. Maple-beech forests are about half of the remaining forest types with the remainder split equally between oak-hickory and lowland hardwood forest types. There are some areas of wet-mesic and wet prairie but only small preserves remain since the landscape is heavily disturbed and fragmented. Because of this isolation, fragmentation, and high level of disturbance, non-native plants are abundant. The watershed is also located in the Southeast Glacial Plains Ecological Landscape, which makes up the bulk of the non-coastal land area in southeast Wisconsin. This Ecological Landscape is made up of glacial till plains and moraines. Most of this Ecological Landscape is composed of glacial materials deposited during the Wisconsin Ice Age, but the southwest portion consists of older, pre-Wisconsin till with a more dissected topography. Soils are lime-rich tills overlain in most areas by a silt-loam loess cap. Agricultural and residential interests throughout the landscape have significantly altered the historical vegetation. Most of the rare natural communities that remain are associated with large moraines or in areas where the Niagara Escarpment occurs close to the surface. Historically, vegetation in the Southeast Glacial Plains consisted of a mix of prairie, oak forests and savanna, and maple-basswood forests. Wet-mesic prairies, southern sedge meadows, emergent marshes, and calcareous fens were found in lower portions of the Landscape. End moraines and drumlins supported savannas and forests. Agricultural and urban land use practices have drastically changed the land cover of the Southeast Glacial Plains since Euro-American settlement. The current vegetation is primarily agricultural cropland. Remaining forests occupy only about 10% of the land area and consist of maple-basswood, lowland hardwoods, and oak. No large mesic forests exist today except on the Kettle Interlobate Moraine which has topography too rugged for agriculture. Some existing forest patches that were formerly savannas have succeeded to hardwood forest due to fire suppression.

Date  2010

Fisheries

There are nearly 200 miles of perennial streams in this watershed. Genesee Creek, Mill Brook, Brandy Brook, Pebble Creek, Pebble Brook and Spring Creek are listed as cold water communities. Genesee and Spring Creeks are brook and brown trout fisheries, while the rest contain cold water communities composed of mottled sculpin and American brook lampreys.

Date  2002

Wildlife and Habitat

Within Honey Creek Wildlife Area, Racine County. T3N-R19E, Sections 10, 15. 80 acres: Cherry Lake Sedge Meadow in a serpentine basin in glacial till and contains southern sedge meadow, fen, and northern wet forest communities. With only a few openings in the deep sedge mat, Cherry Lake is a misnomer. The sedge meadow contains both alkaline- and acid-loving plants. Of special interest are round-leaved sundew, shrubby cinquefoil, yellow twayblade, marsh St. Johns-wort, marsh fern, and sphagnum moss. To the north of the sedge meadow is a small fen. Shrub-carr is scattered throughout the area, and a tamarack-poison sumac bog lies to the northeast. There has been some tamarack die-off, which promotes even more bushy growth. A portion of an esker runs along the west boundary. This upland area has been grazed in the past and is now brushy oldfield. Cherry Lake Sedge Meadow is owned by the DNR and was designated a State Natural Area in 1975. http://dnr.wi.gov/topic/Lands/naturalareas/index.asp?SNA=120 Honey Creek Wildlife Area is a 1,023 acre property in western Racine County. The property is divided into four separate blocks. Habitat on the property consists of oak woodland, lowland woodland, shallow and deep marsh, grassland and agricultural fields. Wildlife on the property includes deer, turkey, waterfowl and other small game. Pheasants are stocked on the property. The Cherry Lake Sedge Meadow State Natural Area is located within the wildlife area. Honey Creek is featured in the Lake Michigan Region of the Great Wisconsin Birding and Nature Trail [PDF exit DNR] as a property with a mix of habitats that provides opportunities to see flycatchers, terns, great blue herons, American bitterns and sandhill cranes. http://dnr.wi.gov/topic/lands/WildlifeAreas/honeycreek.html Martin's Woods features a mesic and wet-mesic forest located on a low, gently sloping terrace adjacent to the Fox River. Sugar maple and basswood dominate the mesic forest while the southern hardwood swamp is dominated by green ash and large swamp white oaks. Associated species include chinquapin oak, basswood, American elm, red maple, black ash, bitternut hickory, and black walnut. The understory includes eastern hop-hornbeam, ironwood, rock elm, gray dogwood, and elderberry. The uncommon Kentucky coffee tree (Gymnocladus dioica) is also present. Vines are prevalent with Virginia creeper, river grape, wild cucumber, wild yam, and upright carrion flower. Poison ivy is ubiquitous and found as a vine, shrub, and herb. The herbaceous flora is rich with many uncommon species including goldenseal (Hydrastis canadensis), forked aster (Aster furcatus) and American gromwell (Lithospermum latifolium). Other species include fragile fern, false mermaid, recurved trillium, declined trillium, spring cress, common great angelica, and hog peanut. Bird species include blue-gray gnatcatcher, veery, wood thrush, wood pewee, ovenbird, scarlet tanager, rose-breasted grosbeak, and indigo bunting. Martin's Woods is owned by the Waukesha Land Conservancy and was designated a State Natural Area in 2002. http://dnr.wi.gov/topic/lands/naturalareas/index.asp?sna=350 Genesee Oak Opening is a classic bur oak opening on rolling, interlobate morainal topography, with open-grown, scattered young trees of moderate size. Numerous small, dry to dry-mesic prairies occur in scattered openings throughout the 15-acre savanna, filled with side-oats grama, big and little blue-stem, pasque flower, rough blazing-star, Indian grass, prairie dock, needle grass, prairie-smoke, and white camas. To the east is a fen with many uncommon plant species. The remainder of the eastern area is disturbed wetland. About one-half mile of Genesee Creek, a fast-flowing, gravel-bottomed stream, flows through the site and is used by uncommon reptiles and amphibians including pickerel frogs. Soils on the uplands are Casco and Rodman loams. Genesee Oak Opening is owned by the DNR and was designated a State Natural Area in 1979. http://dnr.wi.gov/topic/lands/naturalareas/index.asp?sna=153

Date  2014

Middle Fox River - Illinois Watershed At-a-Glance

Impaired Water in Middle Fox River - Illinois Watershed
River and Stream QualityAll Waters in Watershed

The Middle Fox River - Illinois Watershed contains 12.98 miles of Class I trout streams, 4.92 miles of Class II trout streams and 1.53 miles of Class III trout streams. The table below indicates where these trout waters are located along the streams, starting from the mouth at mile zero. There are two outstanding or exceptional resources waters located within the Watershed, Genesee Creek (ERW) and Spring Lake (Outstanding Resources Water). River conditions are a mix of good quality (16%), poor (45%), fair (3%) and unknown condition (36%). Out of the 1495 acres of lakes in the watershed, none of the lake conditions are known.

Date  2014

Watershed Trout Streams
Watershed Outstanding & Exceptional Resources

Lakes and Impoundments

The largest of the 19 lakes in the watershed is Big Muskego Lake with 2,260 acres. This lake is undergoing intensive management following the principles of “biomanipulation” to improve water quality not only within the lake, but further downstream to Wind Lake and the Fox River. This project includes removing rough fish such as carp and bullheads and establishing desirable rooted and emergent aquatic plants. The plants use the nutrients for growth making them unavailable for excessive algae growth and transport to the water column and further downstream. Keeping abundant rooted vegetation and high levels of predator fish maximizes water clarity and grows plants desirable to waterfowl. In addition to the water quality benefits, achieving a more balanced ecosystem for the lake will also maximize opportunities for fishing and other forms of recreation. This type of lake management is very difficult to achieve on a shallow lake like Big Muskego. The soft bottom sediments are susceptible to disturbance by winds, which leads to decreased water clarity, increased nutrient availability, excessive algae growth, and dissolved oxygen fluctuations. These conditions are highly favorable to carp which further degrade the system by their bottom feeding habits. Constant observation and management may be necessary to maintain the balanced environment created by the 1996 drawdown, reseeding and rough fish removal restoration project on Big Muskego Lake. Denoon and Eagle Lakes have participants in the Self Help Lake Monitoring Program.

Date  2002

Impaired Waters

The entire stretch of the Fox River that runs through the watershed is listed as impaired from phosphorus deposition, sediment/total suspended solids and polychlorinated biphenyls (PCBs), which are a class of compounds used in a wide variety of manufacturing processes and in transformers. The use of PCBs in new applications is no longer possible, but historical discharges or dumping of PCBs throughout the U.S. has resulted in contamination of river bottoms where PCBs attach to sediment or soil and is redistributed when the sediment is disrupted or disturbed. Organic contaminants are bio accumulating substances, which mean that they are stored in the fat of animals, such as fish, and transferred to predators, such as humans. A portion of the White River and all of Wind, Little Muskego and Tichigan Lakes are considered impaired due to total phosphorus. Phosphorus has long been recognized as the controlling factor in plant and algae growth in Wisconsin lakes and streams. Small increases in phosphorus can fuel substantial increases in aquatic plant and algae growth, which in turn can reduce recreational use, property values, and public health.

Date  2014

List of Impaired Waters
Watershed Documents
Watershed Grants
Grant Details
Aquatic Invasives Control
Date
10/1/2006
Waters Involved
Eagle Creek
Status
Complete

Eagle Lake Management District: Eagle Lake Native Plant Infestation Control: Implementation of the Eagle Lake Management plan. This grant will be implemented in partnership with LPT 310-07. This grant is for treatment of Eurasian Water Milfoil by the use of 2, 4 D. Chemical treatment will take place in 2007 and 2008, and treatment will be for a maximum of 250 acres each year. The final report will contain maps that show areas treated each year. The report will also list acres treated, volume treated, materials applied and results of annual plant survey as required by the NR 107 permit. Two paper copies and one electronic copy of the report will be provided to the Department.

Exact details for all deliverbles are described in the project description.


Grant Details
Aquatic Invasives Control
Date
10/1/2006
Waters Involved
Eagle Lake
Status
Complete

Eagle Lake Management District: Eagle Lake Native Plant Infestation Control: Implementation of the Eagle Lake Management plan. This grant will be implemented in partnership with LPT 310-07. This grant is for treatment of Eurasian Water Milfoil by the use of 2, 4 D. Chemical treatment will take place in 2007 and 2008, and treatment will be for a maximum of 250 acres each year. The final report will contain maps that show areas treated each year. The report will also list acres treated, volume treated, materials applied and results of annual plant survey as required by the NR 107 permit. Two paper copies and one electronic copy of the report will be provided to the Department.

Exact details for all deliverbles are described in the project description.


Grant Details
Aquatic Invasives Control
Date
4/1/2010
Waters Involved
Eagle Lake
Status
Complete

Eagle Lake Management District: Eagle Lake Restoration Treatment & Evaluation Project: The Eagle Lake Management District will continue their 6 year aquatic chemical treatment plan as a part of the restoration project started in 2007. The goal of the plan is to greatly reduce the frequency of occurrence of Eurasian water milfoil, an established aquatic invasive plant and to eliminate Curly Leaf Pondweed. Chemical treatment will take place in late April or early May of 2010, 2011 and 2012. Point intercept plant surveys (following the established WDNR Hauxwell protocols) will be conducted both pre and post chemical treatment each year. Water quality monitoring, native plantings, Clean Boats, Clean Waters, educational mailings and meetings and clean up kiosk stations will also be part of the project. Chemical treatment areas will be determined each year based on the previous year\2019s plant surveys. The project deliverable is a report that includes 1) all raw plant survey data; 2) maps of proposed and actual treatment areas each year; 3) density/distribution maps for EWM, CLP and the top five native plants found each year in the plant surveys; 4) statistical analysis of the plant survey data each year and a comparison between years, to include frequency of occurrence, actual density, relative density, etc as described in the Hauxwell protocol; 5) a written assessment of the success of the chemical treatment plan implementation; 6) a written assessment of the shifts in the plant community over the three years of the project; 7) recommendations for future management; 8) entry of all watercraft inspection data into the statewide database (SWIMS); 9) a short report summarizing the 2010, 2011 and 2012 CBCW inspection program (how many boats inspected, any difficulties encountered, how many hours worked and a log of the dates/times worked); 10) summary and analysis of the water quality data; 11) a description of the native plantings project and 12) success/shortcomings of the kiosk program.


Grant Details
Aquatic Invasives Control
Date
4/15/2016
Waters Involved
Eagle Lake
Status
Complete

Eagle Lake Management District: Eagle Lake Ais Control Project 2016: The Eagle Lake Management District is sponsoring a project to conduct and evaluate a whole lake Eurasian Water Milfoil (EWM) treatment on Eagle Lake.

Project final deliverables: results of 2 point intercept (P/I) plant surveys; brief summary of the chemical treatment, results of general survey, final report evaluating the effectiveness of the treatment; copies of permits, and entering all data into SWIMS.

Specific project activities: 1)Conduct a whole lake EWM treatment in spring 2016; 2)Conduct a full P/I plant survey in the summer of 2016; 3)Conduct a full P/I plant survey in the summer of 2017; 4)Conduct a general survey in the fall of 2016; 5)Generate a final report.

Special Conditions: 1)All data shall be entered into the SWIMS database; 2) Volunteer lists, equipment use lists and signatures shall be maintained for reporting in kind volunteer labor and equipment. 3) Final report to include distribution and density maps for Eurasian water milfoil, curly leaf pondweed, sago pondweed, chara and other species found with at least 20% frequency of occurrence for each of the 2 years of plant survey data. 4) Final report to also include a table listing the species found in the lake in all years surveyed, including historical data, the frequency of occurrence and the relative density. 5) Final report evaluates the effectiveness of the treatment.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Control
Date
4/1/2014
Waters Involved
Tichigan Lake
Status
Complete

Waterford Waterway Management District: Ais Control: For 2014-2016, the Waterford Waterway Mgt. District will conduct pre-treatment aquatic plant point intercept (PI) surveys, herbicide treating targeting Eurasian water-milfoil (EWM) & curly-leaf pondweed (CLP), post-treatment aquatic plant PI surveys and reports and Clean Boats Clean Waters (CBCW) boat landing staffing. Boat trailer cleaning equipment and signage will be updated at boat landings. In addition, the District will hand harvest areas of AIS growth. They will also build and install duck nest boxes. Deliverables will include maps and data sheets from pre and post treatment PI surveys and an annual report summarizing treatment and vegetation response.


Grant Details
Aquatic Invasives Control
Date
4/15/2018
Waters Involved
Wind Lake
Status
Complete

Wind Lake Management District: Wind Lake Starry Stonewort Control Project: The Wind Lake Management District is sponsoring a project to control starry stonewort in Wind Lake. Project activities include: 1) two whole lake treatments for starry stonewort in 2018 ; 2) collection of residual monitoring samples (partnership between the WLMD and WDNR); 3) a plant biomass study before the treatments and after the two treatments are completed; and 4) data analysis and report writing utilizing data collected during the field season.

Project deliverables include: a final report that includes 1) maps of treated areas, 2) plant distribution maps; 3) tables showing frequency of occurrence and relative densities of plants found in the WDNR point intercept plant surveys; 4) results of the residual monitoring; 5) results of the biomass study; 5) electronic copies of treatment records.

Specific project conditions: A draft copy of the final report will be provided to the WDNR for review before the report is finalized. WDNR will be provided electronic and hard copies of data and reports/plans generated as a result of this project.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Early Detection and Response
Date
8/5/2015
Waters Involved
Big Muskego Lake
Status
Complete

Big Muskego/Bass Bay P & R District: Big Muskego Lake Containment/Suppression Of Starry Stonewort: The Big Muskego Lake/Bass Bay P & R District, in partnership with the City of Muskego and the Wisconsin Department of Natural Resources, will undertake a rapid response project on Big Muskego to control Starry Stonewort, an NR 40 prohibited species, at the three major boat launches (Boxhorn, Hunters and Durham). The project will include a full point intercept plant survey; Clean Boats, Clean Waters inspections at three launches and two years of chemical treatment of Starry Stonewort at 3 launches. The project deliverable will be a report containing the results of the P/I survey (raw data, distribution/density maps of Starry Stonewort, EWM, CLP and the top 7 native plants in terms of frequency of occurrence), results of the boat trailer survey by CBCW inspectors and CBCW data. All Clean Boats, Clean Waters data must be entered in the statewide SWIMS database.


Grant Details
Aquatic Invasives Early Detection and Response
Date
3/20/2023
Waters Involved
Lake Denoon
Status
Complete

Lake Denoon Lake District: Lake Denoon Starry Stonewort Rapid Response Project: Lake Denoon Lake District (LDLD) is sponsoring an Early Detection and Response grant project for Starry Stonewort (SSW) (Nitellopsis obtusa \2013 NR40 prohibited species) evaluation and containment/prevention, in response to the 2022 discovery of SSW in Lake Denoon.

Final deliverables: 1) Installation documentation for informational buoy and 2x AIS removal stations; 2) Sub-PI and PI survey information (data spreadsheets, reports and/or maps); 3) Documentation of SSW hand removal and native plant restoration activities, if pursued; 4) Summary of education/outreach to LDLD members.

Project activities: 1) Education/outreach to LDLD members; 2) Place informational buoy at location of the SSW finding; 3) Installation of 2x AIS removal stations at Lake Denoon launches; 4) Two sub-PI surveys conducted in the summer of 2023 (performed by Waukesha County with assistance from DNR); 5) Full PI surveys completed in August 2023 and 2025 (performed by contracted consultant); 6) Potential diver-assisted hand pulling of SSW; 7) Potential native plant restoration.

Special Conditions: 1) Discussion and approval of potential hand pulling and native restoration shall occur with Department staff prior to those activities occurring; 2) If hand-pulling is pursued, LDLD will submit an NR109 permit accordingly and all removed SSW will be disposed of following Department guidelines; 3) All relevant data shall be entered into SWIMS database.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional AIS Biologist. If consultant is to provide a final report, it is recommended that Grantee provide the AIS Biologist with a draft for comment on report adequacy prior to making final payment to the consultant.


Grant Details
Aquatic Invasives Early Detection and Response
Date
5/26/2015
Waters Involved
Little Muskego Lake
Status
Complete

Little Muskego Lake P & R District: Containment And Suppression Of Starry Stonewort: The Little Muskego Lake Protection and Rehabilitation District, in partnership with the City of Muskego, the Little Muskego Lake Association and the Wisconsin Department of Natural Resources, will undertake a rapid response project on Little Muskego Lake to control and potentially eradicate Starry Stonewort, listed in NR 40 as a prohibited species. The project will include hand pulling by snorkeling and diving; DASH (Diver Assisted Suction Harvesting), a whole lake P/I survey in late August, at least one intensive plant survey in Hillview Bay, Clean Boats, Clean Waters boat inspections at 4 launches, extra signage at launches and potentially a chemical treatment. The project deliverable will be a report containing the results of each hand pulling event; results of each DASH event, results of any chemical treatments, a summary of the Clean Boats, Clean Waters accomplishments, all raw data from plant surveys and maps from each of the plant surveys. All Clean Boats, Clean Waters data must be entered in the statewide SWIMS database.


Grant Details
Aquatic Invasives Early Detection and Response
Date
8/17/2015
Waters Involved
Little Muskego Lake
Status
Complete

Little Muskego Lake P & R District: Containment & Suppression Of Starry Stonewort #2: The Little Muskego Lake Protection and Rehabilitation District, in partnership with the City of Muskego, the Little Muskego Lake Association and the Wisconsin Department of Natural Resources, will undertake a second rapid response project on Little Muskego Lake to control Starry Stonewort, listed in NR 40 as a prohibited species. The project will include hand pulling by snorkeling; DASH (Diver Assisted Suction Harvesting) in Hillview Bay (focusing on the peninsula area) and hand removal of approximately 10 satellite locations by SNUBA. The project deliverable will be a report containing maps denoting where the Starry Stonewort was hand pulled, removed by DASH and removed by SNUBA/hand pulling. The report will also provide a table listing the dates of removal, approximate times, hours of removal, number of staff and which of the three methods was used.


Grant Details
Aquatic Invasives Early Detection and Response
Date
8/23/2017
Waters Involved
Little Muskego Lake
Status
Complete

Little Muskego Lake P & R District: Little Muskego Drawdown To Suppress Starry Stonewort: The Little Muskego Lake Protection and Rehabilitation District, in partnership with the City of Muskego and the Wisconsin Department of Natural Resources, is undertaking an extended 84 inch winter drawdown of Little Muskego Lake. The purpose of the project is to expose Starry Stonewort rhizoids and bulbils to freezing and drying conditions, in an attempt to kill the Starry Stonewort and achieve a significant control of the population. Project deliverables include weekly drawdown reports with photo essays, copies of informational handouts (such as website snapshots, newspaper articles, special mailings, newsletters, etc), pictures of informational signs about the drawdown, drone pictures and drone video (if available). All project deliverables can be provided in electronic format.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/20/2015
Waters Involved
Long Lake
Status
Complete

Long Lake Protection District: Identification And Suppression Of Ssw On Long Lake: The Long Lake Protection District, in partnership with a consultant and the Wisconsin Department of Natural Resources, will undertake a rapid response project on Long Lake to control and prevent the spread of Starry Stonewort, listed in NR 40 as a prohibited species. The project will include hand pulling, a point intercept plant survey, mapping of Starry Stonewort beds and experimental chemical treatments. The project deliverable will be a report containing the results of the P/I survey (raw data, distribution/density maps of Starry Stonewort, EWM, CLP and the top 7 native plants in terms of frequency of occurrence), a map denoting the hand pulled areas, results of the chemical treatments, results of the snorkeling survey and a description of public outreach efforts.


Grant Details
Aquatic Invasives Early Detection and Response
Date
6/1/2016
Waters Involved
Long Lake
Status
Complete

Long Lake Protection District: Identification And Suppression Of Ssw On Long Lake Ii: The Long Lake Protection District will hire a consultant to survey and manage a pioneering population of Starry Stonewort (Nitellopsis obtusa).

Project deliverables: long term management plan; summary of the 2016 hand pulling efforts; summary of the 2016 chemical treatment efforts, 2016 starry stonewort distribution maps; 2016 plant height data; final report evaluating the effectiveness of hand pulling and chemical treatment, copies of permits, and data entry into SWIMS.

Project activities:1) Development of plan for the future monitoring and control of Starry Stonewort in Long Lake; 2) Conduct chemical treatments; 3) Conduct hand pulling of Starry Stonewort; 4) Conduct measurements of plant height for all Starry Stonewort beds; 5) Conduct a snorkel/kayak/boat survey to map starry stonewort distribution; 6) Generate a final report containing all the project deliverables.

Special Conditions:1)All data shall be entered into the SWIMS database; 2) Volunteer and equipment use lists and signatures shall be maintained for reporting in kind volunteer labor and equipment.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Early Detection and Response
Date
5/26/2015
Waters Involved
Muskego Creek
Status
Complete

Little Muskego Lake P & R District: Containment And Suppression Of Starry Stonewort: The Little Muskego Lake Protection and Rehabilitation District, in partnership with the City of Muskego, the Little Muskego Lake Association and the Wisconsin Department of Natural Resources, will undertake a rapid response project on Little Muskego Lake to control and potentially eradicate Starry Stonewort, listed in NR 40 as a prohibited species. The project will include hand pulling by snorkeling and diving; DASH (Diver Assisted Suction Harvesting), a whole lake P/I survey in late August, at least one intensive plant survey in Hillview Bay, Clean Boats, Clean Waters boat inspections at 4 launches, extra signage at launches and potentially a chemical treatment. The project deliverable will be a report containing the results of each hand pulling event; results of each DASH event, results of any chemical treatments, a summary of the Clean Boats, Clean Waters accomplishments, all raw data from plant surveys and maps from each of the plant surveys. All Clean Boats, Clean Waters data must be entered in the statewide SWIMS database.


Grant Details
Aquatic Invasives Early Detection and Response
Date
8/17/2015
Waters Involved
Muskego Creek
Status
Complete

Little Muskego Lake P & R District: Containment & Suppression Of Starry Stonewort #2: The Little Muskego Lake Protection and Rehabilitation District, in partnership with the City of Muskego, the Little Muskego Lake Association and the Wisconsin Department of Natural Resources, will undertake a second rapid response project on Little Muskego Lake to control Starry Stonewort, listed in NR 40 as a prohibited species. The project will include hand pulling by snorkeling; DASH (Diver Assisted Suction Harvesting) in Hillview Bay (focusing on the peninsula area) and hand removal of approximately 10 satellite locations by SNUBA. The project deliverable will be a report containing maps denoting where the Starry Stonewort was hand pulled, removed by DASH and removed by SNUBA/hand pulling. The report will also provide a table listing the dates of removal, approximate times, hours of removal, number of staff and which of the three methods was used.


Grant Details
Aquatic Invasives Early Detection and Response
Date
8/23/2017
Waters Involved
Muskego Creek
Status
Complete

Little Muskego Lake P & R District: Little Muskego Drawdown To Suppress Starry Stonewort: The Little Muskego Lake Protection and Rehabilitation District, in partnership with the City of Muskego and the Wisconsin Department of Natural Resources, is undertaking an extended 84 inch winter drawdown of Little Muskego Lake. The purpose of the project is to expose Starry Stonewort rhizoids and bulbils to freezing and drying conditions, in an attempt to kill the Starry Stonewort and achieve a significant control of the population. Project deliverables include weekly drawdown reports with photo essays, copies of informational handouts (such as website snapshots, newspaper articles, special mailings, newsletters, etc), pictures of informational signs about the drawdown, drone pictures and drone video (if available). All project deliverables can be provided in electronic format.


Grant Details
Aquatic Invasives Early Detection and Response
Date
10/1/2013
Waters Involved
Spring Brook
Status
Complete

Spring Lake Of Waukesha Co Prop Owners Assoc: Spring Lake Phragmites Control Project: The Spring Lake of Waukesha County Property Owners Association will hire a contractor to attempt the eradication of a population of Phragmites located in 2.6 acres of wetlands along the shoreline of Spring Lake. The project will cover a four year period and will include mechanical removal, hand removal, backpack chemical treatment, hand wicking of chemical and foliar spraying of chemical. The contractor will also map areas that need treatment each year. The project deliverable is a report detailing the harvesting and chemical treatments that occurred each year; before and after maps showing the extent of the Phragmites infestation each year, and a discussion that evaluates the effectiveness of the mechanical and chemical treatments.


Grant Details
Aquatic Invasives Early Detection and Response
Date
10/1/2013
Waters Involved
Spring Lake
Status
Complete

Spring Lake Of Waukesha Co Prop Owners Assoc: Spring Lake Phragmites Control Project: The Spring Lake of Waukesha County Property Owners Association will hire a contractor to attempt the eradication of a population of Phragmites located in 2.6 acres of wetlands along the shoreline of Spring Lake. The project will cover a four year period and will include mechanical removal, hand removal, backpack chemical treatment, hand wicking of chemical and foliar spraying of chemical. The contractor will also map areas that need treatment each year. The project deliverable is a report detailing the harvesting and chemical treatments that occurred each year; before and after maps showing the extent of the Phragmites infestation each year, and a discussion that evaluates the effectiveness of the mechanical and chemical treatments.


Grant Details
Aquatic Invasives Early Detection and Response
Date
3/20/2023
Waters Involved
Unnamed
Status
Complete

Lake Denoon Lake District: Lake Denoon Starry Stonewort Rapid Response Project: Lake Denoon Lake District (LDLD) is sponsoring an Early Detection and Response grant project for Starry Stonewort (SSW) (Nitellopsis obtusa \2013 NR40 prohibited species) evaluation and containment/prevention, in response to the 2022 discovery of SSW in Lake Denoon.

Final deliverables: 1) Installation documentation for informational buoy and 2x AIS removal stations; 2) Sub-PI and PI survey information (data spreadsheets, reports and/or maps); 3) Documentation of SSW hand removal and native plant restoration activities, if pursued; 4) Summary of education/outreach to LDLD members.

Project activities: 1) Education/outreach to LDLD members; 2) Place informational buoy at location of the SSW finding; 3) Installation of 2x AIS removal stations at Lake Denoon launches; 4) Two sub-PI surveys conducted in the summer of 2023 (performed by Waukesha County with assistance from DNR); 5) Full PI surveys completed in August 2023 and 2025 (performed by contracted consultant); 6) Potential diver-assisted hand pulling of SSW; 7) Potential native plant restoration.

Special Conditions: 1) Discussion and approval of potential hand pulling and native restoration shall occur with Department staff prior to those activities occurring; 2) If hand-pulling is pursued, LDLD will submit an NR109 permit accordingly and all removed SSW will be disposed of following Department guidelines; 3) All relevant data shall be entered into SWIMS database.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional AIS Biologist. If consultant is to provide a final report, it is recommended that Grantee provide the AIS Biologist with a draft for comment on report adequacy prior to making final payment to the consultant.


Grant Details
Aquatic Invasives Education
Date
4/1/2004
Waters Involved
Eagle Lake
Status
Complete

Eagle Lake Management District: Eagle Lake Apm Plan: A consultant hired by the Eagle Lake Management District will conduct a plant survey with 20 transects in mid summer 2004. The consultant will follow the methodology for the plant survey as outlined in the grant application narrative. The project deliverable for this grant will be submittal of two paper copies and one electronic copy (on a CD-ROM) of the final report to the WDNR. The final report will contain the following elements: 1) Results from the plant survey; 2) Maps of plant beds, lake morphology and ecologically important areas; 3) plant list; 4) Plant management goals, objectives, alternatives and management recommendations; and 5) GPS transect data.


Grant Details
Aquatic Invasives Education
Date
4/1/2013
Waters Involved
Spring Brook
Status
Complete

Spring Lake Of Waukesha Co Prop Owners Assoc: Phragmites Eradication & Restoration Plan: The Spring Lake Property Owners Association will hire a contractor to map the extent of a Phragmites infestation and to develop an eradication plan. Phragmites was documented in the wetland complex surrounding portions of Spring Lake in June 2012. The final report will contain the following elements: 1) an overall map of GPS locations of all clusters of Phragmites found in the wetland complex; 2) zoomed in maps denoting the extent of the larger clusters of Phragmites; 3) a discussion of the timing of treatments, range of treatment concentrations and techniques to be used on the various Phragmites clusters; 4) estimated costs for treatments; 5) plans for follow up treatments; 6) a discussion of the % coverage or % kill will be considered an achievable goal; 7) timetable by year for reaching the achievable goal; and 8) the raw GPS locational data.

The DNR will be provided with two paper copies and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2013
Waters Involved
Spring Lake
Status
Complete

Spring Lake Of Waukesha Co Prop Owners Assoc: Phragmites Eradication & Restoration Plan: The Spring Lake Property Owners Association will hire a contractor to map the extent of a Phragmites infestation and to develop an eradication plan. Phragmites was documented in the wetland complex surrounding portions of Spring Lake in June 2012. The final report will contain the following elements: 1) an overall map of GPS locations of all clusters of Phragmites found in the wetland complex; 2) zoomed in maps denoting the extent of the larger clusters of Phragmites; 3) a discussion of the timing of treatments, range of treatment concentrations and techniques to be used on the various Phragmites clusters; 4) estimated costs for treatments; 5) plans for follow up treatments; 6) a discussion of the % coverage or % kill will be considered an achievable goal; 7) timetable by year for reaching the achievable goal; and 8) the raw GPS locational data.

The DNR will be provided with two paper copies and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2004
Waters Involved
Tichigan Lake
Status
Complete

Waterford Waterway Management District: Invasive Species In Waterford-Tichigan: The WWMD will undertake both a Lake Education Project and an Aquatic Nuisance Species Control Program. The WWMD will purchase exotics species literature for distribution at educational meetings, pontoon classroom days, and area libraries and for mailings to households in the WWMD. The WWMD will also sponsor loosestrife eradication pilot projects and conduct a survey for purple and yellow loosestrife (following protocols established by the Wisconsin Wetlands Association). Project deliverables include: 1) a report on the results of a purple and yellow loosestrife survey; 2) a report on the beetle pilot project and the eradication pilot project; 3) copies of all agendas an/or advertisements for each educational meeting; and 4) a short report recording the education mailings and literature distribution.


Grant Details
Aquatic Invasives Education
Date
10/1/2007
Waters Involved
Unnamed
Status
Complete

Wind Lake Management District: Hydrilla Workshop Wind Lake: The Wind Lake Management District will hold an educational workshop focusing on Hydrilla in February 2008. This workshop will 1) Create awareness of the impact and biology of Hydrilla; 2) Review necessary response strategies of infestation; 3) Determine the legal basis for a specific response strategy; and 4) Identify other potentially invasive species that threaten Wisconsin's waters. Project deliverables include 1) Compilation of information on future management of invasive species; 2) Publication of a fact sheet or informational card with identification of Hydrilla; and 3) A copy of the conference advertising flyer and conference agenda. The grant will pay for publications, facility cost and speaker costs.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Big Muskego Lake
Status
Complete

Big Muskego/Bass Bay P & R District: Big Muskego Lake/Bass Bay P&R District 2016 Clean Boats Clean Waters: The Big Muskego Lake/Bass Bay P & R District is sponsoring a Clean Boats Clean Waters project in 2016 at two public boat landings on Big Muskego Lake and Bass Bay.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Eagle Lake
Status
Complete

Eagle Lake Management District: Eagle Lake Clean Boats Clean Waters 2013: The Eagle Lake Management District is sponoring a Clean Boats Clean Waters project for 2013 at 2 public boat landings on Eagle Lake.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Eagle Lake
Status
Complete

Eagle Lake Management District: Eagle Lake Clean Boats Clean Waters Project 2014: Eagle Lake Management District will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Eagle Lake
Status
Complete

Eagle Lake Management District: Eagle Lake 2015 Clean Boats Clean Waters Project: The Eagle Lake Management District is sponsoring a 2015 Clean Boats Clean Waters project on Eagle Lake which inlcudes one public landing.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Eagle Lake
Status
Complete

Eagle Lake Management District: Eagle Lake Management District 2017 Cbcw: Eagle Lake Management District is sponsoring a Clean Boats Clean Waters project in 2017 at 0 single public boat landings and 1 public boat landing pairs on EAGLE LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Eagle Lake
Status
Complete

Eagle Lake Management District: Eagle Lake Management District 2018 Cbcw: Eagle Lake Management District is sponsoring a Clean Boats Clean Waters project in 2018 at 0 single public boat landings and 1 public boat landing pairs on EAGLE LAKE.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Eagle Lake
Status
Complete

Eagle Lake Management District: Eagle Lake Management District 2019 Cbcw: Eagle Lake Management District is sponsoring a Clean Boats Clean Waters project in 2019 at 0 single public boat landings and 1 public boat landing pairs on EAGLE LAKE (RACINE COUNTY PAR, ZINNEN BOAT LAUNC).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Eagle Lake
Status
Complete

Eagle Lake Management District: Eagle Lake Management District 2020 Cbcw: Eagle Lake Management District is sponsoring a Clean Boats Clean Waters project in 2020 at 0 single public boat landings and 1 public boat landing pairs on EAGLE LAKE (RACINE CO PARK, ZINNEN BOAT LAUNC).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Little Muskego Lake
Status
Complete

Little Muskego Lake P & R District: Little Muskego Lk P&R Distric 2016 Clean Boats Clean Waters: The Little Muskego Lake Protection and Rehabilitation District is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Little Muskego Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Little Muskego Lake
Status
Complete

Little Muskego Lake P & R District: Little Muskego Lake P & R District 2017 Cbcw: Little Muskego Lake P & R District is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on LITTLE MUSKEGO LK.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Little Muskego Lake
Status
Complete

Little Muskego Lake P & R District: Little Muskego Lake P & R District 2018 Cbcw: Little Muskego Lake P & R District is sponsoring a Clean Boats Clean Waters project in 2018 at 1 single public boat landings and 0 public boat landing pairs on LITTLE MUSKEGO.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Little Muskego Lake
Status
Complete

Little Muskego Lake P & R District: Little Muskego Lake P & R District 2019 Cbcw: Little Muskego Lake P & R District is sponsoring a Clean Boats Clean Waters project in 2019 at 0 single public boat landings and 1 public boat landing pairs on , LITTLE MUSKEGO LAK (IDLE ISLE, HILLVIEW).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Little Muskego Lake
Status
Complete

Little Muskego Lake P & R District: Little Muskego Lake P & R District 2020 Cbcw: Little Muskego Lake P & R District is sponsoring a Clean Boats Clean Waters project in 2020 at 0 single public boat landings and 1 public boat landing pairs on LITTLE MUSKEGO LK (IDLE ISLE, HILLVIEW).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Muskego Creek
Status
Complete

Little Muskego Lake P & R District: Little Muskego Lk P&R Distric 2016 Clean Boats Clean Waters: The Little Muskego Lake Protection and Rehabilitation District is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Little Muskego Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Muskego Creek
Status
Complete

Little Muskego Lake P & R District: Little Muskego Lake P & R District 2017 Cbcw: Little Muskego Lake P & R District is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on LITTLE MUSKEGO LK.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2018
Waters Involved
Muskego Creek
Status
Complete

Little Muskego Lake P & R District: Little Muskego Lake P & R District 2018 Cbcw: Little Muskego Lake P & R District is sponsoring a Clean Boats Clean Waters project in 2018 at 1 single public boat landings and 0 public boat landing pairs on LITTLE MUSKEGO.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2019
Waters Involved
Muskego Creek
Status
Complete

Little Muskego Lake P & R District: Little Muskego Lake P & R District 2019 Cbcw: Little Muskego Lake P & R District is sponsoring a Clean Boats Clean Waters project in 2019 at 0 single public boat landings and 1 public boat landing pairs on , LITTLE MUSKEGO LAK (IDLE ISLE, HILLVIEW).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Muskego Creek
Status
Complete

Little Muskego Lake P & R District: Little Muskego Lake P & R District 2020 Cbcw: Little Muskego Lake P & R District is sponsoring a Clean Boats Clean Waters project in 2020 at 0 single public boat landings and 1 public boat landing pairs on LITTLE MUSKEGO LK (IDLE ISLE, HILLVIEW).


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Tichigan Lake
Status
Complete

Town And Country Rc&D: Tichigan Lake Clean Boats Clean Waters 2013: The Town and Country RC&D is sponsoring a Clean Boats Clean Waters project at one public boat landing on the Waterford Impoundment aka Tichigan Lake Fox River, in 2013.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Tichigan Lake
Status
Complete

Town And Country Rc&D: Tichigan Lake Clean Boats Clean Waters Project 2014: Town and Country RC&D/Waterford Waterways Management District will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Tichigan Lake
Status
Complete

Waterford Waterway Management District: Waterford Impoundment Clean Boats Clean Waters Project 2015: Waterford Waterway Management District will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2015


Grant Details
Toxics and Areas of Concern
Date
1/1/2010
Waters Involved
Kinnickinnic River
Status
In_Progress

Develop Multiple Tmdls For The Kinnickinnic River Watershed: The Milwaukee Metropolitan Sewerage District proposes to develop third-party pathogen, phosphorus, and sediment TMDLs for the Kinnickinnic River Watershed in Southeastern Wisconsin. Additionally, Cladophora algae blooms and increased beach closings have been shown to have a direct relationship to polluted stormwater runoff. The TMDLs will result in pollutant load and wasteload allocations that must be met to meet water quality standards and targets and in implementation plans that will identify the steps needed to achieve the load and wasteload allocations.


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Army Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Army Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Bark River
Status
Complete

City Of Delafield: Hlk-Graham Street & Misc Private Property Hl Bmps: The City of Delafield will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan on Nagawicka Lake. Practices include: 350 ft2 native plantings, rain gardens, and diversion practices on 3 properties, including the City\2019s Graham Street demonstration site.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #16 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Benedict Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Benedict Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
9/15/1995
Waters Involved
Big Muskego Lake
Status
Complete

Big Muskego/Bass Bay P & R District: Lmi-Df-Lake Drawdown Diagnostic Feasibility Study: The Big Muskego/Bass Bay Protection and Rehabilitation District proposes to conduct an extensive water quality and aquatic plant diagnostic feasibility examination of the proposed drawdown and fish eradication at Big Muskego Lake. Project activities include determining rates of nitrogen and phosphorous release from sediments, analyzing sediment cores to determine moisture content, density, organic matter, total sediment nitrogen and phohphorous, porewater nitrogen and phosphorous, extractable phosphorous, and exchangeable sediment nitrogen, and evaluating changes in the distribution, abundance, and species composistion of aquatic macrophytes from aerial photography and field survey work before and after drawdown. This agreement covers the costs of the activities listed in the application as scheduled to be performed during 1995. The US Army Corps of Engineers will provide 50% cost share assistance in match to finance the study.


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Booth Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Booth Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Cedar Grove Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Cedar Grove Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Ceylon Lagoon
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Ceylon Lagoon
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Como Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Como Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Comus Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Comus Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Congdon Park Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Congdon Park Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Cravath Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Cravath Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Delavan Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Delavan Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Delavan Lake
Status
Complete

Delavan Lake Sd: Lmi-Permeable Paver Roadway - Delavan Lake Association, Inc.: The Delavan Lake Sanitary District will partner with the Assembly Park subdivision to facilitate the installation of 243,000 square feet of permeable pavers for a 25.4 acre subdivision. Approximately 5 acres of local paved roads will be removed and replaced with permeable pavers. Assembly Park will enter into a 10 year maintenance agreement with the Delavan Lake Sanitary District to retain the pavers. The project deliverables include a narrative detailing the installation of the pavers and a photo essay documenting each step of the construction project.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Delavan Lake
Status
Complete

Delavan Lake Sd: Acq-Brown'S Channel Watershed Land Acquisition #1: The Delavan Lake Sanitary District (DLSD) will use this grant to pay for part of the purchase of 18 lots along Browns Channel, part of Delavan Lake, located in the Town of Delavan. The project includes the Brown parcel (1.38 acres) and the Odling Parcel (0.30 acre), zoned Lowland Conservation District (C4). The parcel borders other DLSD lands under protection.

The DLSD will manage two invasive species, buckthorn and bush honeysuckle and other woody vegetation through yearly removal or cutting, with the goal of removing 80% within three years of property purchase. Native species will be planted in areas that non- native species are removed. Bank stabilization and stream channel habitat improvement projects will also take place.

All maintenance and improvement activities will be the responsibility of the DLSD in accordance with the Land Management Plan, dated January 22nd, 2015.

The project deliverable is the completed land purchase of 1.68 acres of land (the Brown and Odling parcels) in South Shore Manor 1st Addition.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Delavan Lake
Status
Complete

Town Of Delavan: Lmi - Delavan Town Park Bmp Project: The Town of Delavan is sponsoring a project to install Best Management Practices along an unnamed tributary to Delavan Lake that terminates in the Town Park.

Project final deliverables include: a copy of the final plans and specifications and a photo essay showing before and after pictures of each BMP element.
Specific project activities include: 1) development of design and final plans for the project; 2) installation of approximately 10 BMP elements along the unnamed tributary to Delavan Lake.

Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Volunteer lists, equipment use lists and signatures shall be maintained for reporting in kind volunteer labor and equipment.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

The Grantee should provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Eagle Lake
Status
Complete

Eagle Lake Property Owners Improvement Assoc: Res-Eagle Lake Watershed Improvement Project: The Eagle Lake Property Owners Improvement Association is undertaking a project to educate land owners of both lakeshore and streamshore properties of the benefits of shoreland restoration. The major goal of the project will be to install buffer strips along all of the tributaries to the lake and to install buffer strips along various portions of the lake shore. The buffer strips will be installed using native grasses, shrubs, trees, biologs and biomats(coconut fiber). A drain tile pollution study will be conducted to identify any sources of high nutrient loading.

Project products will be the following: Deed restrictions on all buffer installations with a minimum 10 year deed restriction on each parcel listed, buffer installations documented with photographs, a copy of the results of the drain tile pollution study, newletters to residents, and a press release to the public.

Scope change:(7-20-04) The monies designated for streambank stabilization and hight residue management and nutrient plans for the streambank will be all transfered for educational activities. These activities consist of shoreline restoration/naturalization projects on Eagle Lake.


Grant Details
Lake Protection Grant
Date
7/1/2006
Waters Involved
Eagle Lake
Status
Complete

Eagle Lake Management District: Lmi-Eagle Lake Restoration: The Eagle Lake Management District will undertake a whole lake restoration project in cooperation with the DNR, Racine County, the Town of Dover and the Army Corps of Engineers (ACOE). The goals of the restoration include a balanced fishery, improved water quality, reduced nuisance levels of Eurasian water milfoil and restoration of native aquatic plant species.

Project deliverables include 1) annual reports for 2006, 2007, 2008 and 2009; 2) a final report. The annual reports will contain a summary of yearly management activities, results of the water quality monitoring, and results of the aquatic plant survey. The final report will include 1) the watershed assessment; 2) maps of the lake both pre and post treatment with depth, plant height and effectiveness of chemical treatment; 3) copies of educational mailings; 4) copies of minutes from project team meetings and 5) raw data from plant surveys.

Two paper copies and one electronic copy of each annual report as well as the final report will be provided to the department.


Grant Details
Lake Protection Grant
Date
4/15/2019
Waters Involved
Eagle Lake
Status
Complete

Eagle Lake Property Owners Improvement Assoc: Hlk - Eagle Lake Healthy Lakes Project: Partnering with property owners, Eagle Lake Improvement Association is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to program fact sheets, technical guidance and the grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: a project summary including data requirements, pre/post photographs, and confirmation of completed design work and landowner contracts. A Healthy Lakes Example Report is available to assist you.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Eagle Spring Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
7/1/2001
Waters Involved
Eagle Spring Lake
Status
Complete

Eagle Spring Lake Management District: Lmi-Df-Mukwonago River Watershed Feasibiliy Study-Eagle: Studies and Surveys to correct and improve the Watershed conditions. Consultant will see if a draw down stradegy will work. This is to update manangement plan, recommendations to residents, and hold public meetings.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.

Scope change: Additional sediment samples deemed necessary to provide information for report. Labor for sampling will be included in this grant with no cost increase to grant total or SLOH testing.

Scope change: Under budget for fish assessment, seed bank study, mussel survey, and aquatic plant survey so using it for part of a reimbursement on the Wetland Vegetation survey. This survey was in the Feasibility Study which was already submitted. There is a slight cost increase which will be funded by local funds.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Eagle Spring Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
East Troy Pond (Trent)
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
East Troy Pond (Trent)
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Elkhorn Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Elkhorn Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
4/1/1997
Waters Involved
Geneva Lake
Status
Complete

Geneva Lake Environmental Agency: Lmi-Fd-Lake Geneva Diagnostic Feasibility Study: The Geneva Lake Environmental Agency proposes to conduct a diagnostic feasibility study for Lake Geneva in Walworth County. Project activities include 1) 3 year water quality monitoring program, 2) lake sediment core collection and analysis, 3) evaluation of the hydrological regime of and pollutant loading potential of selected streams draining into the lake, 4) quantification and assessment of the quality and status of biological communities in the lake, 5) public information and issues surveys, and 6) preparation and refinement of comprehensive watershed and lake management plans for the lake. This grant covers the first year of project costs.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Geneva Lake
Status
Complete

City Of Lake Geneva: Lmi-Stormwater Management Study Implementation-Geneva: The City of Lake Geneva will implement a stormwater management plan. As part of this stormwater management plan implementation, the city will construct 2 strormwater detention ponds with LPT program funding.


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Geneva Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Geneva Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Goose Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Goose Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Green Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Green Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
9/1/1999
Waters Involved
Henrietta Lake
Status
Complete

Waukesha County Land Conservancy: Acq-Wilson Parcel - Lily Lake: The Waukesha Land Conservancy wishes to purchase 60 acres of land in the SW corner of Waukesha County. Two lakes (Henrietta and Waterville) lie within 750 feet of the property and the parcel contains a 3.2 acre lake, named Lily Lake. The property is also adjacent to Scuppernong Creek. The parcel contains deep marsh, a bog and sedge meadow and is listed as Class 1 Wildlife Habitat. The Waukesha Land Conservancy will provide an area for canoe access and parking. The parcel is listed as a NA-2 by SEWRPC. The landowner is donating $55,000 of value and accepting an offer less than the certified value.
AMENDMENT: The Waukesha Land Conservancy will purchase a total of 60.68 acres, and the project also includes a 40 foot-wide easement and 35 foot-wide building setback extending around the edge of the property acquired and the eastern edge of the wetland complex for the purpose of protecting the wetland and the lake (see project file for legal description).


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Hilburn Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Hilburn Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
3/22/1996
Waters Involved
Honey Lake (Vienna)
Status
Complete

Walworth County: Acq-Honey Lake Land Acquisition - Lin Property: Walworth County will acquire approximately 123 acres of land to preserve and enhance the water quality of the downstream lake, Honey Lake. The goals of the property's management plan are to permanently preserve and protect the diversity and uniqueness of the existing land covering the Sugar Creek floodlands and shorelines, various wetland plan communities, uplands, and open field grasslands and to provide passive recreational opportunities such as hiking, natura study, and cross country skiing.


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Honey Lake (Vienna)
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Honey Lake (Vienna)
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
La Grange Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
La Grange Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Lac La Belle
Status
Complete

Lac La Belle Environmental Foundation: Acq-Lac La Belle Saeger Creek- Kolesar Acquisition: The Lac La Belle Environmental Foundation will acquire one acre of land on Lake Lac La Belle in Waukesha County for the protection and improvement of the water quality of the lake.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Lac La Belle
Status
Complete

Village Of Lac La Belle: Acq- Canceled Lac La Belle Stream Corridor Easement: The Village of Lac La Belle will purchase conservation easements on three Alan Runyard properties in an effort to reduce sediment and phosphorus that flow into Lac La Belle through the Golf Course Stream on the north side of the lake by implementation of best management practices. BMPs include buffer strips planted with native vegetation, clearing of invasive species, and stream bank stabilization. Two properties will have a 75\2019 conservation easement on the east side of the property, along the west bank of the Golf Course Stream. A third conservation easement will be for the construction of a 2.2 acre water quality basin that will intercept runoff and allow pollutants to be removed through settling.

The conservation easements will be held in perpetuity by the Village of Lac La Belle, the grant application sponsor.

The site will be maintained by the easement holder (Village of Lac La Belle) or its designee. Public access is not part of the easement agreement, but as the easement holder, the Village will have the right to enter, construct, install, inspect, operate, maintain, replace and repair landscape and drainage features or improvements within the easement area. The Village will also retain the right to add or remove soils and/or vegetation within the easement.

Special conditions for submittal of recorded easement, canceled checks for purchase of easement and other eligible associated acquisition costs, and other documents will be detailed in the grant contract. Exact details for all deliverables are described in the project description of grant application.


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Lake Beulah
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Beulah
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Lake Ivanhoe
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Ivanhoe
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Lake Lorraine
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Lorraine
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Lake Wandawega
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Wandawega
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
4/15/1996
Waters Involved
Little Muskego Lake
Status
Complete

Little Muskego Lake P & R District: Acq-Little Muskego Lake Land Acquisition - Bohn Property: The Little Muskego Lake P & R District will acquire 8.8 acres located in the SW 1/4 of Section 33 in the City of New Berlin, as part of the Little Muskego Lake Community's plan to purchase, reclaim, restore and preserve approximately 12 miles of stream corridor tributary to Little Muskego Lake. The property includes a segment of Calhoun Creek, wooded floodplain, wetlands, and uplands. Long term goals for this property include maintaining it in its present natural condition. Activities that will be considered for implementation per the property's land management plan include establishment of a prairie on the uplands, construction and placement of wood duck houses, developing a fish habitat improvement plan, and planning and construction of a stable formal trail system within the parcel.


Grant Details
Lake Protection Grant
Date
9/1/1997
Waters Involved
Little Muskego Lake
Status
Complete

Little Muskego Lake P & R District: Acq-Little Muskego Lake P & Rd - Rathke Acquisition: The Little Muskego Lake Protection and Rehabilitation District will acquire 20.57 acres in Waukesha County.The property contains an intermittent stream and wetlands including an emergent wet meadow with thick stand of cattails. Educational benefits of this property will include a formal trail system and educational study station.


Grant Details
Lake Protection Grant
Date
9/1/2009
Waters Involved
Little Muskego Lake
Status
Complete

City Of Muskego: Res-Little Muskego- Holz Island Restoration: The City of Muskego will install a number of shoreline restoration best management practices on Holz Island, located on Little Muskego Lake. These include vegetated rip rap, coconut logs, tree drops, emergent shoreline plantings and prairie plantings. Existing invasive plant species on the island will be cleared and eradicated to the extent possible. Quantities, lengths and methods have been outlined in the grant application. The project deliverables include implementation of the grant application as well as a short report detailing accomplishments, hours spent, materials placed and a picture essay. The picture essay should include before, during and after pictures. Two paper and one electronic copy of the report should be submitted.


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Lulu Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lulu Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Lyons Millpond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lyons Millpond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Middle Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Middle Lake
Status
Complete

Lauderdale Lakes Conservancy, Inc: Acq-Middle Marsh Acquisition: This grant is to aquire the Comar Property of 4.54 acres of upland and marsh property. With this acquistion there will be an easement aquired of 50 foot wide for access to the property purchased.

The closing statement and recording of grant agreement will have to be finalized before issuing payment of grant amount.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Middle Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Mill Lake
Status
Complete

Lauderdale Lakes Management District: Res-Lauderdale Lakes Watershed Protection Project: The Lauderdale Lakes Management District will implement a comprehensive wetland restoration project throughout the watershed.

12/01/99 Scope Change. Wants to acquire land to create a recommended stormwater pond. Money that had been slated to install some BMP's will be shifted to the land acquisition and stormwater pond construction. The BMP's will be installed under the nonpoint program.

03/22/04 Scope Change. Wants to remove Wetland restoration from the project and add Shoreland Stabilization as one of the activities.


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Mill Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Mill Lake
Status
Complete

Lauderdale Lakes Management District: Lauderdale Lakes Wetland Restoration-Mill: The Lauderdale Lakes Management District will continue wetland/shoreland restoration activities on a property they own. 100 feet of shoreline will be stabilized with a combination of deltalock and biolog and planted with native aquatic plants. The approximately 7 acre wetland property will be restored where necessary. Approximately half of the wetland property needs enhancement. Invasive species will be removed. The site will be prepared and planted with native wetland plants. The project deliverable will be a short report detailing the restoration methods used. The report should contain a few before/after pictures. Department staff will tour the completed restoration site before closing the grant and issuing the final grant payment.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Mill Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Millpond Park Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Millpond Park Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Moelter Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Moelter Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
9/1/2009
Waters Involved
Muskego Creek
Status
Complete

City Of Muskego: Res-Little Muskego- Holz Island Restoration: The City of Muskego will install a number of shoreline restoration best management practices on Holz Island, located on Little Muskego Lake. These include vegetated rip rap, coconut logs, tree drops, emergent shoreline plantings and prairie plantings. Existing invasive plant species on the island will be cleared and eradicated to the extent possible. Quantities, lengths and methods have been outlined in the grant application. The project deliverables include implementation of the grant application as well as a short report detailing accomplishments, hours spent, materials placed and a picture essay. The picture essay should include before, during and after pictures. Two paper and one electronic copy of the report should be submitted.


Grant Details
Lake Protection Grant
Date
8/1/1994
Waters Involved
Nagawicka Lake
Status
Complete

City Of Delafield: Acq-Nagawicka Lake-St. Johns Park Acquisition: The City of Delafield will acquire approximately .61 acres of land on the western border of Nagawicka Lake for lake protection and public outdoor recreation purposes. Eligible costs include acquisition of the parcel, appraisal fee and preparation of an environmental assessment


Grant Details
Lake Protection Grant
Date
4/22/1997
Waters Involved
Nagawicka Lake
Status
Complete

Waukesha County Land Conservancy: Acq-Nagawicka Lake Land Acquisition-R&M Investments Property: The Waukesha Land Conservancy proposes to acquire 12.4 acres of land, including 411 feet of shoreline, situated on nagawicka Lake in the Village of Nashota, WUkesha County for lake protection purposes. The property includes approxi 5 acres of upland and 7 acres of wetland that is part of a larger Tamarack Bog. The primary goals of the property's land management plan are to maintain and enhance the natural state of the property, to control non-native and non-bog species, and to allow public access for recreational uses such as hiking, nature appreciation, and for educational purposes.


Grant Details
Lake Protection Grant
Date
9/1/1997
Waters Involved
Nagawicka Lake
Status
Complete

Waukesha County Land Conservancy: Acq-Nagawicka Lake Bog - Parcel 3 Acquisition: The Waukesha Land Conservancy will acquire 2.85 acres of land on Nagawicka Lake for lake protection purposes.


Grant Details
Lake Protection Grant
Date
9/1/2002
Waters Involved
Nagawicka Lake
Status
Complete

City Of Delafield: Lmi-Df-Diagnostic Feasibility Study For Nagawicka: Diagnostic and feasibility study for Nagawicka Lake to improve and enhance the water quality of the Lake. There will be a final design for the wet detention basins based on the preferred design alternatives selected by the City of Delafield and the DNR. There will be at least 6 formal meetings or presentations in addition to the public information meetings anticipated. The details for the study and final design are described in the project description.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Nagawicka Lake
Status
Complete

City Of Delafield: Hlk-Graham Street & Misc Private Property Hl Bmps: The City of Delafield will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan on Nagawicka Lake. Practices include: 350 ft2 native plantings, rain gardens, and diversion practices on 3 properties, including the City\2019s Graham Street demonstration site.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #16 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
North Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
North Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Pell Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Pell Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Peterkin Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Peterkin Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Peters Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Peters Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
2/9/1995
Waters Involved
Pewaukee Lake
Status
Complete

Waukesha County: Acq-Pewaukee Lake Ryan Park Acquisition - Glass Property: The Waukesha County Park and Planning Commission will acquire 86.6 acres of land for lake protection. The preservation of this parcel for open space and passive park use. Eligible costs include acquisition of the parcel, appraisal fee and preparation of an environmental assessment.


Grant Details
Lake Protection Grant
Date
9/1/2012
Waters Involved
Pewaukee Lake
Status
Complete

Lake Pewaukee Sanitary District: Acq-Land Acquisition For Gluth Property: The Pewaukee Lake Sanitary District (PLSD) will use this grant to pay for the recent purchase of the Gluth property, located in the City of Pewaukee. The parcel is 30.67acres, including 26 acres of wetland and 4.67acres of upland woods and prairie. The parcel is primarily located in the shoreland zone of Pewaukee Lake. A tributary to Pewaukee Lake runs through a portion of the parcel. The PLSD will manage the invasive species (primarily buckthorn) through yearly cutting and herbicide treatment. The prairie will be expanded by mowing and seeding. The prairie will also be maintained by periodic controlled burns. The parcel will be used as an educational classroom by the local school district. Posts will be installed on the perimeter of the property to prevent filling of wetlands by adjacent landowners. A trail will be maintained on the property for controlled access. The PLSD hopes to install habitat improvements on the Pewaukee Lake Tributary to improve northern pike spawning. All maintenance and improvement activities will be the responsibility of the PLSD in accordance with the submitted Land Management Plan, dated December 3, 2012.

Exact details for all deliverables are described in the project description of grant application.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Pewaukee Lake
Status
Complete

Lake Pewaukee Sanitary District: Acq-Lake Pewaukee Sd Property Acquisition: The Pewaukee Lake Sanitary District (PLSD) will use this grant to pay for part of the purchase of the Ogden property, located in the Town of Pewaukee. The parcel is 56 acres, including 50 acres of wetland and 6 acres of upland. The site is about a mile upstream of Pewaukee Lake. It contains a spring fed pond and has a class \201CA\201D trout stream, Coldwater Creek running along its southern border. Coldwater Creek flows about a half mile to Coco Creek, which then flow a half mile to Pewaukee Lake. The parcel borders other PLSD lands under protection.

The PLSD will manage an invasive species, buckthorn through yearly removal or cutting, with the goal to remove a minimum of \00BC acre per year. A prairie on the parcel will be maintained by periodic controlled burns at least once every 3 years. The parcel will be used as an educational classroom by the local school district, the Pewaukee River Partnership and the Pewaukee Women\2019s Club. A new wetland delineation will be completed within the first year of ownership. The District will install an asphalt or concrete pad in the upland \201Cbuildable area\201D on the northeast corner of the property to provide for recycling/composting of aquatic plants harvested from Lake Pewaukee. Permanent posts will be placed every 100 feet along the wetland on the edge of the \201Cbuildable \201Carea\201D by the composting site.

A barn will be removed within the first year and a house will be removed within 2 years of PLSD ownership. A small existing garage will remain on site for storage of machinery and tools.

All maintenance and improvement activities will be the responsibility of the PLSD in accordance with the revised Land Management Plan, dated December 31, 2013.


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Pickerel Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Pickerel Lake
Status
Complete

The Nature Conservancy: Acq-Pickerel Lake Fen-Campbell: Purchase of approximately 39 acres of the Campbell property with 1500 feet of lake frontage. This will help to facilitate land management, maintain high water quality, and provide a link to high quality natural areas.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Pickerel Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Pleasant Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Pleasant Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
8/25/1993
Waters Involved
Potter Lake
Status
Complete

Town Of East Troy: Acq-Potter'S Lake Wetland Acquisition-Torp Property: The Town of East Troy will acquire approximately 24 acres west of Potter's Lake for lake protection and outdoor recreation purposes. Eligible costs include the acquisition of the parcel, appraisal fee and survey costs.


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Potter Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Potter Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
9/1/2000
Waters Involved
Powers Lake
Status
Complete

Powers Lake Protection And Rehab. District: Acq-Wetland Acquisition-Powers Lake: This wetland acquisition project includes the following: 1)Acquire through fee simple purchase wetlands reparian to the unnamed stream discharging into Powers Lake; 2)Promote the essential sturcture and function of these wetland areas to ensure positive water quality benefit to the downstream Powers Lake; 3)Facilitate the maintenance of wetland and wildlife habitat within the designated primary environmental corridor tributary to Powers Lake; 4)Encourage public knowledge and understanding of wetland ecosystems through programming in consultation with relevant institutions and agencies.


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Powers Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Powers Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Rice Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Rice Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Silver Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Silver Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Swan Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Swan Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Swift Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Swift Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Tombeau Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Tombeau Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Tripp Lake (Trapp)
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Tripp Lake (Trapp)
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Trout Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Trout Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Turtle Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Turtle Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Unnamed
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Unnamed
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Unnamed
Status
Complete

Town Of Delavan: Lmi - Delavan Town Park Bmp Project: The Town of Delavan is sponsoring a project to install Best Management Practices along an unnamed tributary to Delavan Lake that terminates in the Town Park.

Project final deliverables include: a copy of the final plans and specifications and a photo essay showing before and after pictures of each BMP element.
Specific project activities include: 1) development of design and final plans for the project; 2) installation of approximately 10 BMP elements along the unnamed tributary to Delavan Lake.

Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Volunteer lists, equipment use lists and signatures shall be maintained for reporting in kind volunteer labor and equipment.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

The Grantee should provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Upper Nashotah Lake
Status
Complete

Village Of Summit: Lco-Shoreland Ordinance Development/Update: The Village of Summit intends to update the existing shoreland ordinance to meet the revised standards of NR 115. The Village is proposing to create a separate Village floodplain ordinance. The Village is also proposing to combine the shoreland ordinance and current Village zoning code. The Village will identify representatives from the four lake management districts and several lake associations to assist in the ordinance review. Draft documents will be reviewed by Village staff and officials. Updates will be provided to the public during regularly scheduled public meetings. The project deliverables include 1) minutes and advertisements for the public informational meetings; 2) maps of the updated shoreland jurisdictional boundaries; 3) maps of groundwater recharge areas; 4) a new Village floodplain ordinance and 5) a new combined shoreland ordinance and zoning code. The process of updating the documents is expected to take one year from grant approval.


Grant Details
Lake Protection Grant
Date
1/1/2001
Waters Involved
Whitewater Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Walworth County Shoreland Protection Initiative: Walworth County will implement the Shoreland Protection Initiative project that includes:
1. A baseline lakeshore inventory; 2. ten lakshore demonstration sites; 3. the preparation of lake lawn and yard nutrient management plans; 4. fact sheets on lakeshore stabilization, shoreland buffers, shoreland regulations and lawn care; 5. an annual lakeshore inventory and distribution of shoreland regulation materials; 6. formation of a Walworth Co. Lakes Association and meetings with and newsletter pertaining to Walworth Co. lakes; 7. Workshops, information packets and news articles pertaining to the Fox river Basin Partnership Team Lakes Initiative; and 8. the formation of the Walworth County Land Conservancy.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Whitewater Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Res-Shoreline Habitat Restoration-Walworth Co.: Walworth County will continue the Walworth County Lakes Specialist position for one year. The Lakes Specialist will provide educational information to lake residents regarding shoreline stabilization and shoreline restoration. The Lakes Specialist will also design shoreline restoration projects for interested landowners, provide technical assistance to contractors and hold workshops on shoreland restoration. The project deliverable will be a report containing the following: 1) copies of the shoreland restoration designs; 2) copies of the fliers for each restoration workshop and 3) details regarding the accomplishments of the Lakes Specialist over the year of the grant. Two paper copies and one electronic copy of the report will be provided to the Department of Natural Resources


Grant Details
Lake Protection Grant
Date
9/1/2002
Waters Involved
Willow Springs Lake
Status
Complete

Waukesha County: Acq-Willow Springs-Neubert Property Acquisition: Waukesha County proposes to acquire the 9.7 acre Neubert property, located on Spring Creek - Fox River tributary. The purchase will include approximately 1,000 feet of lake frontage and help insure water quality to Willow Springs Lake. This grant will also maintain wetland and the wildlife habitat and to develop public information programs.


Grant Details
Lake Protection Grant
Date
2/26/1996
Waters Involved
Wind Lake
Status
Complete

Wind Lake Management District: Acq-Wind Lake Land Acquisition-Duve Property: The Wind Lake Management District will acquire 58.278 acres of tiled, drained, and cropped land in the vicinty of Big Muskego and Wind Lakes for wetland restoration and lake protection purposes. Long term goals for this property include constructing wetland cells through wiich discharges from Big Muskego Lake would be directed, and allowing as much public access as possible to the property without jeopardizing the wetland complex.

The Nonpoint Source Pollution Abatement Program will fund 50% of this land Acquisition project.


Grant Details
Lake Protection Grant
Date
2/6/1997
Waters Involved
Wind Lake
Status
Complete

Wind Lake Management District: Lmi-Wind Lake Alum Treatment: The Wind Lake Management District will conduct an alum treatment program for Wind Lake in Racine County.

Amendment #1 includes the coverage of the up stream area called Bass Bay which will directly affect Wind Lake.


Grant Details
Lake Protection Grant
Date
9/1/1997
Waters Involved
Wind Lake
Status
Complete

Wind Lake Management District: Acq-Wind Lake Guhr Acquisition: The Wind Lake Management District intends to acquire the Guhr property (approx. 21 acres) and the Schweitzer property (approx. 57 total including 4 ac. easement) for lake protection benefits associated with Wind Lake in Racine County.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Army Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Army Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
1/23/1997
Waters Involved
Bass Bay Lake
Status
Complete

Big Muskego/Bass Bay P & R District: Big Muskego/Bass Bay Rate Of Phosphorus And Nitrogen Release: The Big Muskego/Bass Bay Protection and Rehabilitation District proposes to study the impact of the Big Muskego Lake drawdown on the rates of nitrogen and phosphorus release from lake sediments. The Department of Natural Resources will be provided with a paper copy and an electronic copy of the final report summarizing the project results. Information about the project will be disseminated to the public by summary report mailing, public meeting, and newsletter mailing.


Grant Details
Large Scale Lake Planning
Date
1/23/1997
Waters Involved
Bass Bay Lake
Status
Complete

Big Muskego/Bass Bay P & R District: Big Muskego/Bass Bay Sediment Composition Study: The Big Muskego/Bass Bay Protection and Rehabilitation District proposes to perform a sediment composition assessment as part of the diagnostic feasibility study of the Big Muskego lake drawdown. The Department of Natural Resources will be provided with a paper copy and an electronic copy of the final report summarizing the project results. Information about the project results will be disseminated to the public by summary report mailing, public meeting, and newsletter mailing.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Benedict Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Benedict Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
1/3/1991
Waters Involved
Big Muskego Lake
Status
Complete

Big Muskego/Bass Bay P & R District: Big Muskego Lake Water Qual Monitor & Nonpoint Pollut Assmt: Continuation of USGS monitoring program (begun in 1989) through 1994. Expansion of the information to detail water quality conditions and determine sources of nonpoint pollution. Results will be used for educational efforts and to adopt a plan for waterquality improvement. An annual progress report is to be submitted at the end of each year of monitoring. Project must include an assessment of opportunities for future public access. Included in the project is a formal presentation to the public andpreparation of a final report. Information will be distributed to the public by public meetings and local newspaper articles. Project results will be reposited at Muskego Library/City Hall.


Grant Details
Large Scale Lake Planning
Date
4/6/1994
Waters Involved
Big Muskego Lake
Status
Complete

Big Muskego/Bass Bay P & R District: Big Muskego Lake Phosphorus Release & Sedimentation Study: The Big Muskego Bass Bay Lake District proposes to seek information relating to existing conditions with respect to phosphorous release from bottom sediments and the factors affecting the re-suspension of nutrients and sediment. Project activites include1) construct or purchase and temporarily install 8 limno corrals 2) conduct water quality monitoring biweekly for 14 weeks within the 8 limno corrals and one reference site, 3) information will be disseminated to the public by public meetings. Projectresults will be reposited at the City of Muskego Library.


Grant Details
Large Scale Lake Planning
Date
3/31/1995
Waters Involved
Big Muskego Lake
Status
Complete

Big Muskego/Bass Bay P & R District: Big Muskego Lake Hydraulic Drawdown Planning: Review and analysis of the hydraulic drawdown of Big Muskego Lake in order to safely and effectively dewater the basin in a timely and predictable manner. Determine the coordination of the water elevations, flow rates, and timing for Big Muskego Lake andthe three other dams in the watershed. Formulation of a detailed plan for the drawdown of Big Muskego Lake, incorporating all of the variables that may impact the drawdown. Development of design specifications and completion of permit applications forlandowner projects. Information will be disseminated to the public by public meetings, summary report mailings and a comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
1/23/1997
Waters Involved
Big Muskego Lake
Status
Complete

Big Muskego/Bass Bay P & R District: Big Muskego Lake Drawdown Diagnostic Feasibility Study Repor: The Big Muskego/Bass Bay Protection and Rehabilitation District proposes to produce a final technical report detailing the results of the Big Muskego Lake drawdown diagnostic Feasibility study. Project activities include producing an interim data summary report and a final technical report, and associated project coordination and administration activities. The Department of Natural Resources will be provided with a paper copy and an electronic copy of the final report. Information about the project results will be disseminated to the public by report mailing, public meeting, and newsletter mailing.


Grant Details
Large Scale Lake Planning
Date
1/23/1997
Waters Involved
Big Muskego Lake
Status
Complete

Big Muskego/Bass Bay P & R District: Big Muskego/Bass Bay Aquatic Macrophyte Study: The Big Muskego/Bass Bay Protection and Rehabilitation District proposes to study the effects of the Big Muskego Lake drawdown on aquatic macrophyte communities in the Big Muskego Lake complex. The Department of Natural Resources will be provided with a paper copy and an electronic copy of the final report summarizing the project results. Information about the project results will be disseminated to the public by summary report mailing, public meeting, and newsletter mailing.


Grant Details
Large Scale Lake Planning
Date
1/23/1997
Waters Involved
Big Muskego Lake
Status
Complete

Big Muskego/Bass Bay P & R District: Big Muskego/Bass Bay Rate Of Phosphorus And Nitrogen Release: The Big Muskego/Bass Bay Protection and Rehabilitation District proposes to study the impact of the Big Muskego Lake drawdown on the rates of nitrogen and phosphorus release from lake sediments. The Department of Natural Resources will be provided with a paper copy and an electronic copy of the final report summarizing the project results. Information about the project will be disseminated to the public by summary report mailing, public meeting, and newsletter mailing.


Grant Details
Large Scale Lake Planning
Date
1/23/1997
Waters Involved
Big Muskego Lake
Status
Complete

Big Muskego/Bass Bay P & R District: Big Muskego/Bass Bay Sediment Composition Study: The Big Muskego/Bass Bay Protection and Rehabilitation District proposes to perform a sediment composition assessment as part of the diagnostic feasibility study of the Big Muskego lake drawdown. The Department of Natural Resources will be provided with a paper copy and an electronic copy of the final report summarizing the project results. Information about the project results will be disseminated to the public by summary report mailing, public meeting, and newsletter mailing.


Grant Details
Large Scale Lake Planning
Date
4/1/2002
Waters Involved
Big Muskego Lake
Status
Complete

City Of Muskego: Big Muskego/Bass Bay Mgt. Plan: City of Muskego wants to produce a formal Lake Management Plan that will be used to implement furture management strategies on Big Muskego Lake and Bass Bay. Data will be gathered for this report and an aquatic plant survey will be done to assist in this plan.

Lake Management Plan will be printed and a copy given to the DNR for review.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Booth Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Booth Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Cedar Grove Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Cedar Grove Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Ceylon Lagoon
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Ceylon Lagoon
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Como Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Como Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Comus Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Comus Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Congdon Park Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Congdon Park Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Cravath Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Cravath Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Cross Canal
Status
Complete

Wind Lake Management District: Wind Lake Plant Management Plan Update: The Wind Lake Management District is sponsoring a project to develop an update to the Aquatic Plant Management Plan for Wind Lake.

Project final deliverables include: all data collected and a detailed aquatic plant management plan for harvesting and chemical treatment on Wind Lake.

Specific project activities include: 1) conducting a P/I survey; 2) conducting a general meander survey; 3) conducting an AIS launch survey; 4) a report that contains summary tables, plant distribution maps, harvesting plan with cutting specifics, disposal site information and potential chemical treatment plans.

Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Volunteer lists, equipment use lists and signatures shall be maintained for reporting in kind volunteer labor and equipment.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

The Grantee should provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Delavan Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Delavan Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
4/12/1991
Waters Involved
Eagle Lake
Status
Complete

Eagle Lake Property Owners Improvement Assoc: Eagle Lake Water Quality Monitoring: WATER QUALITY MONITORING. PUBLIC NEEDS QUESTIONNAIRE SURVEY TO BE CONDUCTED. TECHNICALMEMORANDUM WILL BE PREPARED SUMMARIZING DATA COLLECTED AND RESULTS OF PUBLIC NEEDS SURVEY. INFORMATION DISSEMINATION. AN ASSESSMENT OF OPPORTUNITIES FOR FUTURE PUBLIC ACCESS IS TO BE CONDUCTED.


Grant Details
Large Scale Lake Planning
Date
11/25/1992
Waters Involved
Eagle Lake
Status
Complete

Eagle Lake Property Owners Improvement Assoc: Eagle Lake Water Quality Monitoring & Aquatic Plan Mgmt Plan: Water quality monitoring during 1993-95. Prepare an aquatic plant management plan which include a map of the lake and shoreline and subjects listed in 'Guidance for Aquatic Plant Management Plan'.Prepare public information handouts. Information will be disseminated to the public by newsletter and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/3/1995
Waters Involved
Eagle Lake
Status
Complete

Eagle Lake Property Owners Improvement Assoc: Eagle Lake Management Planning: Define the watershed for Eagle Lake. Conduct water quality monitoring and assess its quality. Identify existing and potential future water quality problems.Identify specific planning needs for the lake. Formulate appropriate public information and education strategies, ordinances, and other possible responses.Evaluate non-point source loading in the watershed. Disseminate information to the public by public meetings, and final report mailings to interested parties.


Grant Details
Large Scale Lake Planning
Date
4/1/1996
Waters Involved
Eagle Lake
Status
Complete

Eagle Lake Property Owners Improvement Assoc: Eagle Lake Eurasian Watermilfoil Weevil Study: The Eagle Lake Property Owners Improvement Association proposes to evaluate the effect of the supplemental enhancement of weevil populations as a selective aquatic plant management technique to control Myriophyllum spicatum. Project activities will result in a field evaluation of experimental weevil stocking, a status report and presentation to the lake group, and a final report including feasibility recommendations. The Department of Natural Resources will be provided with a paper copy and an electronic copy of the final report. Information about the project will be disseminated to the public by fact sheet distribution, public meeting, and summary mailings. end.


Grant Details
Large Scale Lake Planning
Date
1/1/1990
Waters Involved
Eagle Spring Lake
Status
Complete

Eagle Spring Lake Management District: Eagle Spring Lake Management Plan: Develop a lake management plan which will include elements listed under 'Proposed Phase II Planning Program,' attached to the application. Information will be disseminated to the public by newsletter, local newspaper articles, public meetings and reportmailings. Project results will be reposited at the Village of Eagle Public Library, Town of Eagle Town Hall.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Eagle Spring Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Eagle Spring Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
East Troy Pond (Trent)
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
East Troy Pond (Trent)
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Elkhorn Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Elkhorn Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Geneva Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Geneva Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Goose Lake Br Canal
Status
Complete

Wind Lake Management District: Wind Lake Plant Management Plan Update: The Wind Lake Management District is sponsoring a project to develop an update to the Aquatic Plant Management Plan for Wind Lake.

Project final deliverables include: all data collected and a detailed aquatic plant management plan for harvesting and chemical treatment on Wind Lake.

Specific project activities include: 1) conducting a P/I survey; 2) conducting a general meander survey; 3) conducting an AIS launch survey; 4) a report that contains summary tables, plant distribution maps, harvesting plan with cutting specifics, disposal site information and potential chemical treatment plans.

Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Volunteer lists, equipment use lists and signatures shall be maintained for reporting in kind volunteer labor and equipment.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

The Grantee should provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Goose Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Goose Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Green Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Green Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Hilburn Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Hilburn Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Honey Lake (Vienna)
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Honey Lake (Vienna)
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
La Grange Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
La Grange Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Beulah
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Beulah
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
1/3/1991
Waters Involved
Lake Denoon
Status
Complete

Lake Denoon Advancement Association: Lake Denoon Usgs Water Quality Monitoring: Water quality monitoring by the U. S. Geological Survey 5 times a year for six years, 1991 to 1996. Purpose is to monitor the impacts of development around the lake and ascertain the effectiveness of newly placed siltration ponds. Lake associationmembers will take weekly lake-stage readings and report these to U.S.G.S. personnel. An annual progress report will be submitted after each year of monitoring. Project includes preparation of a final report and a presentation to the public where copiesof the report will be available. Information will also be dispursed through press releases, report mailings, and posting of the results in the Muskego City Hall and the Public library. Data reporting format is to be worked out in consultation with BobWakeman, DNR district contact. Project results will be reposited at the City of Muskego, Wisconsin.


Grant Details
Large Scale Lake Planning
Date
2/1/1996
Waters Involved
Lake Denoon
Status
Complete

Lake Denoon Advancement Association: Lake Denoon Watershed Stormwater Management Planning: Create a stormwater management plan for the Lake Denoon watershed; produce a report that identifies recommendations for stormwater mangement; produce a guide to assist managers in stormwater management decisions; draft language for a stormwater management ordinance.


Grant Details
Large Scale Lake Planning
Date
10/1/2012
Waters Involved
Lake Denoon
Status
Complete

City Of Muskego: Lake Mgt. Plan For Lake Denoon: The City of Muskego will hire a contractor to conduct a plant survey and update the aquatic plant management plan for Denoon Lake. The plant survey will be a point intercept survey with the number of points to be generated by DNR science services. The lake will be sampled in mid-summer. The final report will contain the following elements: 1) Results of the points sampled, including sediment type found and maximum rooting depth; 2) Results of a general lake survey to map general plant beds, map localized plant beds, map species distribution, summary tables and a list of plant species found; 3) Individual maps of species distribution for the top 5 native species found as well as Eurasian water milfoil and Curly Leaf Pondweed; 4) Review of existing conditions of the watershed, identify and quantify potential point and nonpoint sources of pollution; 5) Results of WILMS and UAL modeling; 6) Results of a recreational use survey; 7) An aquatic plant management plan that meets the requirements of NR 109.09; and 8) Minutes from one public meeting regarding aquatic plant issues.

The DNR will be provided with two paper copies and an electronic copy of the final report.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Ivanhoe
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Ivanhoe
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
4/1/1996
Waters Involved
Lake Lorraine
Status
Complete

Town Of Richmond: Lorraine Lake Eurasian Watermilfoil Weevil Study: The Town of Richmond, Walworth County proposes to evaluate the effect of the supplemental enhancement of weevil populations as a selective aquatic plant management technique to control Myriophyllum spicatum. Project activities will result in a field evaluation of experimental weevil stocking, a status report and presentation to the lake group, and a final report including feasibility recommendations. The Department of Natural Resourcese will be provided with a paper copy and an electronic copy of the final report. Information about the project will be disseminiated to the public by fact sheet distribution, public meeting, and summary report mailing.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Lorraine
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Lorraine
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Wandawega
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lake Wandawega
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/11/1991
Waters Involved
Linie Lac
Status
Complete

City Of New Berlin: Linnie Lac Sociological Survey & Sedimentation Study: 1) Conduct a public opinion survey of lake property owners and residents.2) Conduct a survey of the lake bottom to assess sediment deposition.3) Conduct an assessment of opportunities for future public access.4) Disseminate information to the public through public meetings, newspaper articles, and summary report mailings.


Grant Details
Large Scale Lake Planning
Date
4/6/1994
Waters Involved
Linie Lac
Status
Complete

Big Muskego/Bass Bay P & R District: Big Muskego Lake Phosphorus Release & Sedimentation Study: The Big Muskego Bass Bay Lake District proposes to seek information relating to existing conditions with respect to phosphorous release from bottom sediments and the factors affecting the re-suspension of nutrients and sediment. Project activites include1) construct or purchase and temporarily install 8 limno corrals 2) conduct water quality monitoring biweekly for 14 weeks within the 8 limno corrals and one reference site, 3) information will be disseminated to the public by public meetings. Projectresults will be reposited at the City of Muskego Library.


Grant Details
Large Scale Lake Planning
Date
1/3/1991
Waters Involved
Little Muskego Lake
Status
Complete

Little Muskego Lake Association: Little Muskego Lake Watershed Inventory: Entire watershed inventory by the Waukesha County Land Conservation Committee and an independent contractor. Project will include land use inventory using new aerial photographs, past and present in-lake monitoring data, WIN model; recommendation oflands for preservation and conservation; updating of Lake Use Report No. FX10-Little Muskego Lake; weekly bacteria sampling at inlet and public beach during spring and summer; publication and distribution of final report. Format for data reporting is tobe worked out in consultation with DNR district contact. Information will be disseminated to the public by public meetings and local newspaper articles. Project results will be reposited at the Muskego Library and City Hall.


Grant Details
Large Scale Lake Planning
Date
10/11/1991
Waters Involved
Little Muskego Lake
Status
Complete

Little Muskego Lake P & R District: Little Muskego Lake Usgs Water Quality Monitoring: USGS will analyze 5 years of lake monitoring data that it has collected and produce a summary of results which will be sent to DNR. Information will be disseminated to the public through newsletter mailings, public meetings, summary report mailings, andby submitting a report to the North American Lake Management Society for publication.


Grant Details
Large Scale Lake Planning
Date
11/23/1992
Waters Involved
Little Muskego Lake
Status
Complete

Little Muskego Lake Association: Little Muskego Lake Sediment Analysis And Water Qual Educati: 1) Prepare and distribute a public informational packet on lake water quality and recreational issues. 2) Gather information on land parcels proposed for acquisition by the Land Conservance Trust. 3) Conduct sediment sampling and analysis. 4) DNRshall receive copies of the final report. 5) Information shall be disseminated to the public by newsletter, fact sheet, and public meeting. The final report will be reposited at the City of Muskego Public Library - City Hall.


Grant Details
Large Scale Lake Planning
Date
9/1/2005
Waters Involved
Little Muskego Lake
Status
Complete

Little Muskego Lake P & R District: Lake Management Plan Update And Workbook Development: This grant will update the existing lake management plan, develop a workbook for pontoon classrooms, conduct pontoon classrooms and provide mailings to district members (both lake newsletters and invasive species information). The project deliverables will be the following: 1) An updated lake managment plan containing updates of water quality monitoring and a remapping of lake watershed land uses; 2) a workbook for pontoon classrooms; 3) copies of newsletters and a sample of mailings sent to all residents and 4) a summary report of the accomplishments of the pontoon classrooms (2 to be conducted). Two copies of each project deliverable must be provided to the Department before final payment.


Grant Details
Large Scale Lake Planning
Date
12/20/1990
Waters Involved
Long Lake
Status
Complete

Tri-Lakes Conservation, Inc.: Kee-Nong-Go-Mong Usgs Water Quality Monitoring: Continuation of USGS water quality monitoring program for 1991 through 1996. Sampling to be conducted 5 times a year. An annual progress report will be submitted at the end of each monitoring year.Information will be disseminated to the public by a publlic meeting.


Grant Details
Large Scale Lake Planning
Date
2/26/1996
Waters Involved
Long Lake
Status
Complete

Town Of Norway: Kee-Nong-Go-Mong Lake Watershed Stormwater Mgmt Planning: The Town of Norway proposes to conduct stormwater managment planning for the Kee-Nong-Go-Mong Lake watershed. Project elements include a summary of watershed natural resource and land use data, hydrologic and hydraulic analysis, pollutant load modelling, and analysis of future water quality and quantity problems, farmland and highway runoff problems, and streambank erosion, as described in the project application. Project activities will result in an evaluatino of alternatives and recommendatiosn for specific flood and drainage control measures for agricultural, residential, and commercial areas. The Sponsor will prepare a final report of the project including the results of the above activities. The results of the project will be disseminated to the public by public meeting and local newspaper article. The sponsor will provide the Department of Natural Resources with a paper copy and an electronic copy of teh report.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lulu Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lulu Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lyons Millpond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Lyons Millpond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Middle Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Middle Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Mill Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Mill Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Millpond Park Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Millpond Park Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Moelter Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Moelter Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
1/1/1990
Waters Involved
Mukwonago River
Status
Complete

Eagle Spring Lake Management District: Eagle Spring Lake Management Plan: Develop a lake management plan which will include elements listed under 'Proposed Phase II Planning Program,' attached to the application. Information will be disseminated to the public by newsletter, local newspaper articles, public meetings and reportmailings. Project results will be reposited at the Village of Eagle Public Library, Town of Eagle Town Hall.


Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Muskego Canal
Status
Complete

Wind Lake Management District: Wind Lake Plant Management Plan Update: The Wind Lake Management District is sponsoring a project to develop an update to the Aquatic Plant Management Plan for Wind Lake.

Project final deliverables include: all data collected and a detailed aquatic plant management plan for harvesting and chemical treatment on Wind Lake.

Specific project activities include: 1) conducting a P/I survey; 2) conducting a general meander survey; 3) conducting an AIS launch survey; 4) a report that contains summary tables, plant distribution maps, harvesting plan with cutting specifics, disposal site information and potential chemical treatment plans.

Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Volunteer lists, equipment use lists and signatures shall be maintained for reporting in kind volunteer labor and equipment.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

The Grantee should provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
9/1/2005
Waters Involved
Muskego Creek
Status
Complete

Little Muskego Lake P & R District: Lake Management Plan Update And Workbook Development: This grant will update the existing lake management plan, develop a workbook for pontoon classrooms, conduct pontoon classrooms and provide mailings to district members (both lake newsletters and invasive species information). The project deliverables will be the following: 1) An updated lake managment plan containing updates of water quality monitoring and a remapping of lake watershed land uses; 2) a workbook for pontoon classrooms; 3) copies of newsletters and a sample of mailings sent to all residents and 4) a summary report of the accomplishments of the pontoon classrooms (2 to be conducted). Two copies of each project deliverable must be provided to the Department before final payment.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
North Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
North Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Pell Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Pell Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Peterkin Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Peterkin Pond
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Peters Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Peters Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Pickerel Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Pickerel Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Pleasant Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Pleasant Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Potter Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Potter Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Powers Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Powers Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Rice Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Rice Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Silver Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Silver Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Swan Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Swan Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Swift Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Swift Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
4/22/1993
Waters Involved
Tichigan Lake
Status
Complete

Town Of Waterford: Tichigan Lake (Waterford Impoundment) Management Planning: Conduct water quality monitoring. Conduct a public opinion survey of sanitary district residents. Conduct an aquatic plant survey of the Impoundment. Prepare a collection of preserved and identified plan samples.Information will be disseminated to the public by fact sheet, local newspaper articles, and public meetings.


Grant Details
Large Scale Lake Planning
Date
4/1/2003
Waters Involved
Tichigan Lake
Status
Complete

Waterford Waterway Management District: Lake Mgt. Plan For Waterford-Phase 1: SEWRPC Lake Management Plan will be written for the lake system. Plan will include the following: water quality data, aquatic plant inventory, recreational use survey, WILMS watershed modeling, refinement of environmental corridors and discussion of management alternatives. TSI Monitoring with USGS will be conducted.

Project deliverable is the completed lake management plan report for Phase 1 & 2.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
4/1/2003
Waters Involved
Tichigan Lake
Status
Complete

Waterford Waterway Management District: Lake Mgt. Plan For Waterford-Phase 2: SEWRPC Lak Management Plan will written for the lake system. Plan will include the following: water quality data, aquatic plant inventory, recreational use survey, WILMS watershed modeling, refinement of environmental corridors and discussion of management alternatives.

Project deliverable is the completed lake management plan report for Phase #2.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Tombeau Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Tombeau Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Tripp Lake (Trapp)
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Tripp Lake (Trapp)
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Trout Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Trout Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Turtle Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Turtle Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
12/20/1990
Waters Involved
Unnamed
Status
Complete

Tri-Lakes Conservation, Inc.: Kee-Nong-Go-Mong Usgs Water Quality Monitoring: Continuation of USGS water quality monitoring program for 1991 through 1996. Sampling to be conducted 5 times a year. An annual progress report will be submitted at the end of each monitoring year.Information will be disseminated to the public by a publlic meeting.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Unnamed
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Unnamed
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
1/8/1991
Waters Involved
Waubeesee Lake
Status
Complete

Tri-Lakes Conservation, Inc.: Waubeesee Lake Usgs Water Quality Monitoring: Continuation of USGS water quality monitoring for 1991-1996, 5 times a year. An annual progress report will be submitted at the endof each year of monitoring. Information will be disseminated to the public by public meeting. Project must include an assessment of opportunities for future public access.


Grant Details
Large Scale Lake Planning
Date
2/27/1996
Waters Involved
Waubeesee Lake
Status
Complete

Town Of Norway: Waubeesee Lake Watershed Stormwater Management Planning: The Town of Norway proposes to conduct stormwater management planning for the Waubeesee Lake watershed. Project elements include a summary of watershed natural resource and land use data, hydrologic and hydraulic analysis, pollutant load modelling, and analysis of future water quality and quantity problems, farmland and highway runoff problems, and streambank erosion, as described in the project application. Project activities will result in an evaluation of alternatives and recommendations for specific flood and drainage control measures for agricultural, residential, and commercial areas.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Whitewater Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lake Community Planning Inventory-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to 99 units of government and lake associations in Walworth County that are directly involved with the 36 lakes in Walworth County. The survey will inquire about institutional tools, laws, ordinances, studies and educational programs that currently exist or are needed. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Whitewater Lake
Status
Complete

Walworth Cnty Land Use & Res Mgt: Lakehore Landowners Survey Grant-Walworth Co.: The Walworth County Land Use and Resource Management Department will develop a survey to send out to approximately 6000 lakeshore landowners. The survey will inquire about landowner knowledge, views, perceptions and interest in water quality problems and water quality protection measures. The project deliverables include a copy of the survey and the final report containing the analysis of the completed surveys.

Grantee provide final report to DNR Lake Coordinator. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
10/1/2000
Waters Involved
Willow Springs Lake
Status
Complete

Spring Brook Watershed Lake Management Dist: Willow Spring/Spring Lake H2o Monitoring: The Spring Brook Watershed Lake Management District will develop a lake management plan that includes: 1.) deliniation/compilation of data, 2.) water quality date evaluation, 3.) assessment of recreational use and use demands, 4.) review of lake water quality and use problems, 5.) identification of community concerns, 6.) determination of alternative in-lake water quality management actions, 7.) review and identification of environmentally critical areas, 8.) identification of future community information needs, 9.) developmen of recommended in-lake water quality management actions, 10.) distribution of final reports and management plan.


Grant Details
Large Scale Lake Planning
Date
11/25/1991
Waters Involved
Wind Lake
Status
Complete

Wind Lake Management District: Wind Lake Management Info Booklet & Aquatic Plant Study: 1) Condense the Southeastern Regional Planning Committee's lake management report into a nontechnical booklet for the public.2) Conduct an aquatic plant competition study.3) Conduct Buckthorn management testing.4) Prepare report detailing the results of tasks 2 and 3 above.5) Disseminiate information to the public via the nontechnical booklet, newsletter mailings, public meetings, and entire report mailings.


Grant Details
Large Scale Lake Planning
Date
2/28/1995
Waters Involved
Wind Lake
Status
Complete

Wind Lake Management District: Wind Lake Bathymetric Map Development: 1. Develop a standard bathymetric map giving depth contours at one foot intervals with a stage/volume relationship.
2. Develop a map showing the relative reflectivity of the bottom lake sediments. One meter core samples will be taken and percent solids determined from different reflectivity zones to quantify the reflectivity values shown on the map.
3. CAD data files will be supplied for both maps.
4. Prepare a final report summarizing the results of tasks above.
5. Disseminate information on the project results to the public by newsletter mailings and public meeting.


Grant Details
Large Scale Lake Planning
Date
4/1/2003
Waters Involved
Wind Lake
Status
Complete

Wind Lake Management District: Wind Lake Plan Reassessment: Project will look at data collected since the last Wind Lake Management Report done in 1991. The updated report will contain the following:

1) Water quality data
2) A general aquatic plant inventory will be conducted and mapped
3) Recreational use surveys will be conducted and reported
4) Shoreline condition survey/map
5) Review of problems
6) Discussion of management alternatives (harvesting, etc.)

Project deliverable will be the completed report containing the above elements. SEWRPC report.

The DNR will be provided with both a hard copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Wind Lake
Status
Complete

Wind Lake Management District: Wind Lake Plant Management Plan Update: The Wind Lake Management District is sponsoring a project to develop an update to the Aquatic Plant Management Plan for Wind Lake.

Project final deliverables include: all data collected and a detailed aquatic plant management plan for harvesting and chemical treatment on Wind Lake.

Specific project activities include: 1) conducting a P/I survey; 2) conducting a general meander survey; 3) conducting an AIS launch survey; 4) a report that contains summary tables, plant distribution maps, harvesting plan with cutting specifics, disposal site information and potential chemical treatment plans.

Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Volunteer lists, equipment use lists and signatures shall be maintained for reporting in kind volunteer labor and equipment.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

The Grantee should provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Large Scale Lake Planning
Date
2/15/2017
Waters Involved
Wind Lake Canal
Status
Complete

Wind Lake Management District: Wind Lake Plant Management Plan Update: The Wind Lake Management District is sponsoring a project to develop an update to the Aquatic Plant Management Plan for Wind Lake.

Project final deliverables include: all data collected and a detailed aquatic plant management plan for harvesting and chemical treatment on Wind Lake.

Specific project activities include: 1) conducting a P/I survey; 2) conducting a general meander survey; 3) conducting an AIS launch survey; 4) a report that contains summary tables, plant distribution maps, harvesting plan with cutting specifics, disposal site information and potential chemical treatment plans.

Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Volunteer lists, equipment use lists and signatures shall be maintained for reporting in kind volunteer labor and equipment.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

The Grantee should provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Small Scale Lake Planning
Date
4/1/2013
Waters Involved
Little Muskego Lake
Status
Complete

Little Muskego Lake P & R District: Update Of Apm Plan:
The Little Muskego Lake Protection and Rehabilitation District will hire a contractor to conduct a plant survey and update the aquatic plant management plan for Little Muskego Lake. The plant survey will be a point intercept survey totaling 710 points. The lake will be sampled in mid-summer. The final report will contain the following elements: 1) Results of the points sampled, including sediment type found and maximum rooting depth; 2) Results of a general lake survey to map general plant beds, map localized plant beds, map species distribution and a list of plant species found; 3) Review of existing conditions of the watershed, identify and quantify potential point and nonpoint sources of pollution, and identify nutrient and contaminant input and balances; 4) Results of WILMS and UAL modeling; 5) Results of a recreational use survey; 6) An aquatic plant management plan that meets the requirements of NR 109.09; and 7) Minutes from one public meeting regarding aquatic plant issues.

Two paper copies and one electronic copy of the final plan will be provided to the department. Exact details for all deliverables are described in the project description of grant application.


Grant Details
Small Scale Lake Planning
Date
2/15/2017
Waters Involved
Little Muskego Lake
Status
Complete

Little Muskego Lake P & R District: Collection And Analysis Of Little Muskego Lake Data: The Little Muskego P & R District is sponsoring a project to 1) study the impact of a winter drawdown (to combat starry stonewort) and 2) collect information needed to plan for a future whole lake spring treatment to combat Eurasian water milfoil and curly leaf pondweed. The whole lake treatment plan will be developed separately from this grant.

Project deliverables: all data collected and detailed report containing the results of the specific project activities.

Specific project activities: 1) Use GPS/GIS and transect the lake to determine bottom contours; 2) develop a bathymetric map of the lake; 3) determine lake acreage that will be exposed (dry) in the winter for various intervals of drawdown (12 in., 24 in., 36 in., 42 in. and 84 in. if pumping occurs); 4) determine volume of water in the lake for each foot of depth contour; 5) determine how long it will take (number of days) to draw down the lake 42 inches and 84 inches if pumping occurs; 6) determine how long (approximate number of days) it will take to refill the lake in the spring after replacing the boards in the dam; 7) determine safe discharge rate during drawdown to prevent downstream flooding and erosion; 8) compile temperature profiles collected by both DNR staff in past years and temperature profiles collected by LMPRD in the spring of 2017.

Special Conditions: 1) All data shall be entered into the SWIMS database.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

The Grantee should provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Small Scale Lake Planning
Date
4/1/2013
Waters Involved
Muskego Creek
Status
Complete

Little Muskego Lake P & R District: Update Of Apm Plan:
The Little Muskego Lake Protection and Rehabilitation District will hire a contractor to conduct a plant survey and update the aquatic plant management plan for Little Muskego Lake. The plant survey will be a point intercept survey totaling 710 points. The lake will be sampled in mid-summer. The final report will contain the following elements: 1) Results of the points sampled, including sediment type found and maximum rooting depth; 2) Results of a general lake survey to map general plant beds, map localized plant beds, map species distribution and a list of plant species found; 3) Review of existing conditions of the watershed, identify and quantify potential point and nonpoint sources of pollution, and identify nutrient and contaminant input and balances; 4) Results of WILMS and UAL modeling; 5) Results of a recreational use survey; 6) An aquatic plant management plan that meets the requirements of NR 109.09; and 7) Minutes from one public meeting regarding aquatic plant issues.

Two paper copies and one electronic copy of the final plan will be provided to the department. Exact details for all deliverables are described in the project description of grant application.


Grant Details
Small Scale Lake Planning
Date
2/15/2017
Waters Involved
Muskego Creek
Status
Complete

Little Muskego Lake P & R District: Collection And Analysis Of Little Muskego Lake Data: The Little Muskego P & R District is sponsoring a project to 1) study the impact of a winter drawdown (to combat starry stonewort) and 2) collect information needed to plan for a future whole lake spring treatment to combat Eurasian water milfoil and curly leaf pondweed. The whole lake treatment plan will be developed separately from this grant.

Project deliverables: all data collected and detailed report containing the results of the specific project activities.

Specific project activities: 1) Use GPS/GIS and transect the lake to determine bottom contours; 2) develop a bathymetric map of the lake; 3) determine lake acreage that will be exposed (dry) in the winter for various intervals of drawdown (12 in., 24 in., 36 in., 42 in. and 84 in. if pumping occurs); 4) determine volume of water in the lake for each foot of depth contour; 5) determine how long it will take (number of days) to draw down the lake 42 inches and 84 inches if pumping occurs; 6) determine how long (approximate number of days) it will take to refill the lake in the spring after replacing the boards in the dam; 7) determine safe discharge rate during drawdown to prevent downstream flooding and erosion; 8) compile temperature profiles collected by both DNR staff in past years and temperature profiles collected by LMPRD in the spring of 2017.

Special Conditions: 1) All data shall be entered into the SWIMS database.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

The Grantee should provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Small Scale Lake Planning
Date
4/1/2005
Waters Involved
Unnamed
Status
Complete

Waubeesee Lake Protection District: Waubeesee Community Survey: The Waubesee LPD will hire a consultant to send out a community socioeconomic survey to all District members. The survey will address respondents concerns and perceptions regarding lake conditions, lake uses and lake water quality. The survey will contain approximately 60 - 75 questions. The project deliverable will be a report that compiles the results of the survey and provides summary data. The report will be submitted in both electronic and paper form to the Dept. of Natural Resources.


Grant Details
Small Scale Lake Planning
Date
10/1/2006
Waters Involved
Unnamed
Status
Complete

Waubeesee Lake Protection District: Waubeesee Lake Protection District, Aquatic Plant Survey: The Waubeesee Lake Protection District will hire a consultant to conduct a plant survey and develop an aquatic plant management plan. The Waubeesee Lake Protection District will provide two paper copies and one electronic copy of the final report. The report will contain the following elements:

" Raw data - At least 100 sampling points will be established in the littoral zone using GPS units. Sampling points will be equally distributed throughout the depth of littoral zone.
" Sediment type data
" Maximum rooting depth
" General follow up survey to document general location of plant beds and species
" Samples of each plant collected will be mounted and labeled.
" Aquatic plant management plan that discusses specific alternatives that are feasible on Waubeesee Lake.
" Maps showing aquatic plant beds and areas of proposed management alternatives.

Exact details for all deliverbles are described in the project description.


Grant Details
Small Scale Lake Planning
Date
10/1/2007
Waters Involved
Unnamed
Status
Complete

Waubeesee Lake Protection District: Waubeesee Lake Do Meter Purchase: The Waubeesee Lake Protection District will purchase a temperature and dissolved oxygen meter for the Waubeesee Lake Citizen Lake Monitoring program. The data collected using the meter will be entered into the Department of Natural Resources Citizen Lake Monitoring website to be used by the DNR and the lake district. The project deliverable will be temperature and D.O. profiles (every three feet to the bottom of the lake) taken a minimum of five times a year and entered into the DNR database.


Grant Details
Small Scale Lake Planning
Date
10/1/2008
Waters Involved
Unnamed
Status
Complete

Waubeesee Lake Protection District: Waubeesee Lake Apm Plan: The Waubeesee Lake Protection District will hire a contractor to develop an aquatic plant management plan. The plan will utilize plant survey data collected from a previous grant. This project will determine the extent of invasive species in Waubeesee Lake and what treatment would be necessary to promote native species growth. The final report will include: 1)Historic plant and plant control activities, discussion & analysis of current control, maps of plant beds, maps of proposed treatment areas and lake use and boat ordinances. 2)Discussion & description of sensitive area, source of plant problems, exotic species and recommendations for plant control, both mechanical and chemical.

Grantee is to provide draft copies of the report to Craig Helker and Heidi Bunk (DNR staff). Two paper and one electronic .pdf copy of the final report must be submitted to the DNR prior to the submission of grantee's final payment request.


Grant Details
Small Scale Lake Planning
Date
2/15/2017
Waters Involved
Unnamed
Status
Complete

Waubeesee Lake Protection District: Waubeesee Lake Plant Management Plan Update: The Waubeesee Lake Protection District is sponsoring a project to develop an update to the Aquatic Plant Management Plan for Waubeesee Lake.

Project final deliverables include: all data collected and a detailed aquatic plant management plan for harvesting and chemical treatment on Waubeesee Lake.

Specific project activities include: 1) conducting a P/I survey; 2) conducting a general meander survey; 3) conducting an AIS launch survey; 4) a report that contains summary tables, plant distribution maps, harvesting plan with cutting specifics, disposal site information and potential chemical treatment plans.

Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Volunteer lists, equipment use lists and signatures shall be maintained for reporting in kind volunteer labor and equipment.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

The Grantee should provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Small Scale Lake Planning
Date
4/1/2005
Waters Involved
Waubeesee Lake
Status
Complete

Waubeesee Lake Protection District: Waubeesee Community Survey: The Waubesee LPD will hire a consultant to send out a community socioeconomic survey to all District members. The survey will address respondents concerns and perceptions regarding lake conditions, lake uses and lake water quality. The survey will contain approximately 60 - 75 questions. The project deliverable will be a report that compiles the results of the survey and provides summary data. The report will be submitted in both electronic and paper form to the Dept. of Natural Resources.


Grant Details
Small Scale Lake Planning
Date
10/1/2006
Waters Involved
Waubeesee Lake
Status
Complete

Waubeesee Lake Protection District: Waubeesee Lake Protection District, Aquatic Plant Survey: The Waubeesee Lake Protection District will hire a consultant to conduct a plant survey and develop an aquatic plant management plan. The Waubeesee Lake Protection District will provide two paper copies and one electronic copy of the final report. The report will contain the following elements:

" Raw data - At least 100 sampling points will be established in the littoral zone using GPS units. Sampling points will be equally distributed throughout the depth of littoral zone.
" Sediment type data
" Maximum rooting depth
" General follow up survey to document general location of plant beds and species
" Samples of each plant collected will be mounted and labeled.
" Aquatic plant management plan that discusses specific alternatives that are feasible on Waubeesee Lake.
" Maps showing aquatic plant beds and areas of proposed management alternatives.

Exact details for all deliverbles are described in the project description.


Grant Details
Small Scale Lake Planning
Date
10/1/2007
Waters Involved
Waubeesee Lake
Status
Complete

Waubeesee Lake Protection District: Waubeesee Lake Do Meter Purchase: The Waubeesee Lake Protection District will purchase a temperature and dissolved oxygen meter for the Waubeesee Lake Citizen Lake Monitoring program. The data collected using the meter will be entered into the Department of Natural Resources Citizen Lake Monitoring website to be used by the DNR and the lake district. The project deliverable will be temperature and D.O. profiles (every three feet to the bottom of the lake) taken a minimum of five times a year and entered into the DNR database.


Grant Details
Small Scale Lake Planning
Date
10/1/2008
Waters Involved
Waubeesee Lake
Status
Complete

Waubeesee Lake Protection District: Waubeesee Lake Apm Plan: The Waubeesee Lake Protection District will hire a contractor to develop an aquatic plant management plan. The plan will utilize plant survey data collected from a previous grant. This project will determine the extent of invasive species in Waubeesee Lake and what treatment would be necessary to promote native species growth. The final report will include: 1)Historic plant and plant control activities, discussion & analysis of current control, maps of plant beds, maps of proposed treatment areas and lake use and boat ordinances. 2)Discussion & description of sensitive area, source of plant problems, exotic species and recommendations for plant control, both mechanical and chemical.

Grantee is to provide draft copies of the report to Craig Helker and Heidi Bunk (DNR staff). Two paper and one electronic .pdf copy of the final report must be submitted to the DNR prior to the submission of grantee's final payment request.


Grant Details
Small Scale Lake Planning
Date
4/1/2012
Waters Involved
Waubeesee Lake
Status
Complete

Waubeesee Lake Protection District: Waubeesee Lake Aquatic Plant Management Planning Project: The Waubeesee Lake Protection District will hire a contractor to conduct a plant survey and update the aquatic plant management plan for Waubeesee Lake. The plant survey will be a point intercept survey with the approximately 218 points. The lake will be sampled in mid-summer. The final report will contain the following elements: 1) Results of the points sampled, including sediment type found and maximum rooting depth; 2) Results of a general lake survey to map general plant beds, map localized plant beds, map species distribution and a list of plant species found; 3) Individual maps of species distribution for the top 5 native species found as well as Eurasian water milfoil and Curly Leaf Pondweed; 4) An aquatic plant management plan that meets the requirements of NR 109.09; and 5) Minutes from one public meeting regarding aquatic plant issues.


Grant Details
Small Scale Lake Planning
Date
2/15/2017
Waters Involved
Waubeesee Lake
Status
Complete

Waubeesee Lake Protection District: Waubeesee Lake Plant Management Plan Update: The Waubeesee Lake Protection District is sponsoring a project to develop an update to the Aquatic Plant Management Plan for Waubeesee Lake.

Project final deliverables include: all data collected and a detailed aquatic plant management plan for harvesting and chemical treatment on Waubeesee Lake.

Specific project activities include: 1) conducting a P/I survey; 2) conducting a general meander survey; 3) conducting an AIS launch survey; 4) a report that contains summary tables, plant distribution maps, harvesting plan with cutting specifics, disposal site information and potential chemical treatment plans.

Special Conditions: 1) All data shall be entered into the SWIMS database; 2) Volunteer lists, equipment use lists and signatures shall be maintained for reporting in kind volunteer labor and equipment.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

The Grantee should provide the DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Small Scale Lake Planning
Date
4/1/2005
Waters Involved
Wind Lake
Status
Complete

Wind Lake Management District: Usgs-Water Monitoring - Wind Lake: The Wind Lake Management District will contract with the US Geological Survey for one year of water quality monitoring. The project deliverable will be a copy of the USGS annual report that contains all of the data collected during the project period. The report will be submitted in paper and electronic form to the Dept. of Natural Resources.


Grant Details
Small Scale Lake Planning
Date
4/1/2005
Waters Involved
Wind Lake Canal
Status
Complete

Wind Lake Management District: Usgs-Water Monitoring - Wind Lake: The Wind Lake Management District will contract with the US Geological Survey for one year of water quality monitoring. The project deliverable will be a copy of the USGS annual report that contains all of the data collected during the project period. The report will be submitted in paper and electronic form to the Dept. of Natural Resources.


Grant Details
Targeted Runoff - Rural Construction
Date
8/10/2005
Waters Involved
Muskego Canal
Status
Complete

Wind Lake Management District: Muskego Canal Shoreline: To cost-share shoreline stabilization practices along the Muskego Canal immediately above Wind Lake.


Grant Details
Targeted Runoff - Urban Construction
Date
1/1/2004
Waters Involved
Muskego Canal
Status
Complete

Wind Lake Management District: Muskego Canal Shoreline Stabilization: to cost-share at 70% landowner installations of shoreline stabilization practices


Grant Details
Targeted Runoff - Urban Construction
Date
1/1/2010
Waters Involved
White River
Status
Complete

City Of Burlington: White River Streambank Stabilization: To cost-share design and installation of streambank protection practices along Echo Lake and the White River to remediate erosion and sedimentation, provide a runoff buffer, and improve habitat.


Grant Details
Urban Nonpoint - Stormwater Planning
Date
1/1/2008
Waters Involved
Fox River
Status
Complete

Town Of Vernon: Storm Water Planning: To cost-share development of a storm water management plan covering the Town of Vernon, creation of a pollution prevention program, provision for public participation, and analysis of the feasibility for establishing an alternative funding capacity for storm water costs.


Grant Details
Urban Nonpoint - Stormwater Planning
Date
1/1/2008
Waters Involved
Unnamed
Status
Complete

Town Of Vernon: Storm Water Planning: To cost-share development of a storm water management plan covering the Town of Vernon, creation of a pollution prevention program, provision for public participation, and analysis of the feasibility for establishing an alternative funding capacity for storm water costs.


Grant Details
River Planning Grant
Date
7/1/2001
Waters Involved
Fox River
Status
Complete

Fox River Watershed C.A.U.S.E., Inc.: Fox River Cause Marketing & Communication Project: This grant is to promote and educate the community by gaining community participation and obtain interest from local businessess and groups. This will be done by advertising, promotional workshops, surveys, distribution of printed materials, increased partnering with local schools, businesses, and civic groups. Also, have river restroation activities in conjunction with partnered community groups. Surveys to be done that will take place in relationship to demographics, interest, awareness, and education with the community.


Grant Details
River Planning Grant
Date
2/15/2017
Waters Involved
Fox River
Status
Complete

Fox Wolf Watershed Alliance: Education & Changing Behaviors In The Lower Fox River: The Fox-Wolf Watershed Alliance is sponsoring a project to increase public awareness of watershed function, ecosystem health, and non-point source pollution related to the Lower Fox River.

Project final deliverables include: all data collected, agendas and minutes for planning meetings, newsletters and educational materials provided to the public.

Specific project activities include: 1) Update and distribute the Erosion and Sediment Control Field Guide; 2) Update and distribute Responsible Construction brochure; 3) Explore the possibility of erosion control certification in NE WI; 4) Host a one day erosion control workshop for small-scale urbanized construction activities; 5) Host a 1.5 day Certified Inspector of Sediment and Erosion Control workshop; 6) Create a database for winter parking lot maintenance activities; 7) Develop an informational brochure or flier regarding winter parking lot and sidewalk maintenance; 8) Host a one-day workshop for winter parking lot and sidewalk maintenance; 9) Develop a planning document regarding stormwater control structures; 10) Create a database of stormwater control structure owners; 11) Develop and distribute educational material addressing stormwater structure inspections, maintenance and care; and 12) Host a one day workshop regarding stormwater control structures.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Rivers Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Rivers Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
River Planning Grant
Date
2/15/2017
Waters Involved
Fox River
Status
In_Progress

Fox Wolf Watershed Alliance: Education & Changing Behaviors In The Lower Fox River: The Fox-Wolf Watershed Alliance is sponsoring a project to increase public awareness of watershed function, ecosystem health, and non-point source pollution related to the Lower Fox River.

Project final deliverables include: all data collected, agendas and minutes for planning meetings, newsletters and educational materials provided to the public.

Specific project activities include: 1) Update and distribute the Erosion and Sediment Control Field Guide; 2) Update and distribute Responsible Construction brochure; 3) Explore the possibility of erosion control certification in NE WI; 4) Host a one day erosion control workshop for small-scale urbanized construction activities; 5) Host a 1.5 day Certified Inspector of Sediment and Erosion Control workshop; 6) Create a database for winter parking lot maintenance activities; 7) Develop an informational brochure or flier regarding winter parking lot and sidewalk maintenance; 8) Host a one-day workshop for winter parking lot and sidewalk maintenance; 9) Develop a planning document regarding stormwater control structures; 10) Create a database of stormwater control structure owners; 11) Develop and distribute educational material addressing stormwater structure inspections, maintenance and care; and 12) Host a one day workshop regarding stormwater control structures.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Rivers Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Rivers Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
River Protection Grant
Date
10/18/2000
Waters Involved
Genesee Creek
Status
Complete

Waukesha County Land Conservancy: Genesee Creek Headwaters Restoration: This restoration will implement the Waukesha Co. Development Plan by preserving the isolated natural area and enhancing the wildlife habitat on the entire site. It will be available for public use, such as, walk-in boat access where the stream crosses Hwy DE. Restoring the historic water levels and return the site to a native, wetland perennial plant community. Fifty acres will be kept in native perennial plant cover, a vegetative buffer will be provided around the wetlands. US Fish and Wildlife Service will provide, install the water level control valve, and survey the drain tiles.


Grant Details
River Protection Grant
Date
7/1/2004
Waters Involved
Genesee Creek
Status
Complete

Trout Unlimited-Southeast Chapter: Genesee Creek Dam Removal: This grant is to help fund a dam removal project on Genesee Creek. This a class 1 trout stream and an ERW. This six-mile tributary of the Fox River is one of the few trout streams in Waukesha County with a naturally reproducing population of Brook and Brown Trout. The Genesee Roller Mill dam is failing and poses a threat to public safety. The dam also impairs stream habitat and water quality. The dam was constructed in 1847 and consists of a 480-foot earthen embankment and a 15-foot wide concrete structure. The impoundment is approximately 2.5 acres and is filled with approximately 15,000 cubic yards of sediment.

The proposal includes a community demonstration project that will model ecological restration of the trout stream, adjacent wetlands, and riparian habitat. A restroation plan will be created in the winter of 2004. EA, preliminary plans, and survey data are submitted. Chapter 30 permit applications have been submitted and the EA is complete.

Project deliverables will include a final report with pre and post stream ecosystem analysis. Project and report will involve school groups and general public involvement for I&E prurposes. There will be donated value of volunteer hours from numberous local groups. Carroll College is contributing $500.00 grant. Other grant application dollars are expected to also match the total project costs.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Volunteer Monitoring

At least six Water Action Volunteers have monitored seven unique stations in the FX04- Middle Fox River watershed from 2003 to 2012. Five stations have been monitored for biotic index, flow, dissolved oxygen, instantaneous temperature and transparency using Level 1 procedures (http://watermonitoring.uwex.edu/wav/monitoring/methods.html), and entered in the WAV database (http://www.uwex.edu/erc/wavdb/). Three of the stations have been monitored for dissolved oxygen, pH, instantaneous and continuous temperature and transparency using Level 2 procedures (http://watermonitoring.uwex.edu/level2/methods_data.html), and entered into the SWIMS database On average, a station was visited five times throughout a season (monthly from May through September). (http://prodoasjava.dnr.wi.gov/swims/welcome.do). On average, volunteers collect macroinvertebrates twice a year to determine a biotic index for each stream monitored. Streams are considered in poor quality if biotic index is between 1.0-2.0, fair quality if between 2.1-2.5, and in good quality if the index is between 2.6-3.5. Average biotic index values rated streams in the watershed to be in fair quality (ranging from 2.0-2.5). The lowest biotic index value was reported near the end of June (1.5 at Fox River S of Capital). Genesee Creek at Old Village Road (CBSM-683230) is the only site with significant stream flow data with 35 measurements over eight years and recorded average flow measurements of 12 cubic feet per second (cfs) and ranging from 0.8 to 56.4 cfs. Dissolved oxygen readings were recorded at all stations using both Level 1 and Level 2 methods. Generally, volunteers recorded dissolved oxygen levels in the watershed ranging from 4.5-14mg/l, which are sufficient to sustain aquatic life. One field entry recorded at Fox River S of Capital from Barker Rd measured a dissolved oxygen reading below acceptable levels (2.5mg/l on 9/1/2007 at 11AM); the rest of the season remained at normal levels. Volunteers collected 24 pH measurements within state standards (which range from 6 to 9) ranging from 7.56 to 8.24. Temperature measurements, used to classify streams as cold, cool or warm water habitats, and which are indicative of the ability of a habitat to sustain aquatic species, were manually recorded at all of the stations. Maximum instantaneous temperatures were below 25°C for most streams; suggesting they may be cold water streams. One field entry from July 2011 in Genesee Creek (CBSM-683230) reached 28.4°C, bordering cool to warm water stream classification. Maximum daily mean temperatures from the continuously measured temperatures in 2011 at three sites confirm instantaneous suggested classifications of cold to cool water streams. Stream transparency measurements primarily indicated good water quality with 80% of measurements less than 10 NTU. For more information about individual stations or to better understand how the findings relate to aquatic life, see station reports posted on the WAV website: http://watermonitoring.uwex.edu/level2/reportsbycounty/

Date  2012

Grants and Management Projects
Middle Fox River - Illinois Watershed

Goals

9/19/2014
Create Total Maximum Daily Load analyses and implementation plans to restore waters identified as exceeding water quality standards.

Priorities

9/19/2014
Restore impaired waters including the Fox River and lakes identified as exceeding phosphorus thresholds.
Watershed Recommendations
Best Management Practices, Implement
Respect our Waters NPS Ed.-Greater Milwaukee Watersheds
Date
Status
This project promotes nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: a comprehensive storm water information and education program.
1/1/2018
In Progress
Projects
 
Best Management Practices, Implement
Brown Deer - SW Management Plan Update & TMDL Analysis
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated storm water ordinance for new development and re-development; other updated ordinances that affect runoff from the developed urban area; updated storm water management plan for the entire developed urban area; and an updated storm water management plan for new development.
1/1/2018
In Progress
Projects
 
Best Management Practices, Implement
Whitewater Business Park Armory Detention Basin
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Specifically, the municipality will construct/install a wet detention pond to remedy discharges of total suspended solids in urban runoff.
1/1/2017
In Progress
Projects
 
Best Management Practices, Implement
South Janesville Street Detention Basin
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Specifically, the municipality will construct/install a wet detention pond to remedy discharges of total suspended solids in urban runoff.
1/1/2017
In Progress
Projects
 
Best Management Practices, Implement
St. Francis City Wide Storm Water Quality Mgmt Plan Update
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated construction erosion control ordinance, updated storm water ordinance for new development and re-development, updated ordinances that affect runoff from the developed urban area, updated feasibility analysis of alternative funding mechanisms, updated storm water management plan for the developed urban area, and updated storm water management plan for new development.
1/1/2016
In Progress
Projects
Documents
 
Best Management Practices, Implement
Sherwood - MS4 Planning
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated construction erosion control ordinance, updated storm water ordinance for new development and re-development, new ordinances that affect runoff from the developed urban area, new storm water financing mechanism, new storm water management plan for the developed urban area, and updated storm water management plan for the developed urban area.
1/1/2016
In Progress
Projects
Documents
 
Best Management Practices, Implement
Whitewater Ann Street Detention Basin
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Specifically, the grantee will implement: street detention basin
1/1/2015
In Progress
Projects
Documents
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Cost-Share Agreement
Packard Avenue Reconstruction Streetscape Project
Date
Status
This grant provides funding and authorizes cost-share reimbursement by the department for the above-named project as described in the grant application submitted for calendar year 2015 for the eligible storm water construction activities listed in the application to address nonpoint sources of pollution.
1/1/2015
In Progress
Projects
 
Dam Safety or Removal
 
Date
Status
It is recommended that dam removal and habitat improvements be implemented to improve existing conditions. Where practical, habitat restoration and buffer implementation should be employed to provide multiple benefits including bank stabilization, water quality, fisheries, reduced sedimentation and nutrient loading.
9/19/2014
Proposed
Projects
 
Monitor Aquatic Biology
 
Date
Status
This lake is undergoing intensive management following the principles of biomanipulation to improve water quality not only within the lake, but further downstream to Wind Lake and the Fox River..
9/19/2014
In Progress
 
Monitor Aquatic Biology
Spring Brook biological monitoring
Date
Status
Spring Brook biological monitoring is needed because there has been a decline in the macroinvertebrate community in the last 20 years.
7/16/2013
Proposed
Projects
 
Monitor Water Quality or Sediment
Monitor Genesee Creek for Temperature
Date
Status
Temperature exceedance based on station near pool (not representative). Recommend monitoring an alternate station for temperature. data collection during 2012 was drought year and high atmospheric temps
8/21/2019
Proposed
 
Monitor Water Quality or Sediment
Monitor Spring Brook for Temperature
Date
Status
QC calls into question reliablility of continuous data for comparison to criteria. Recommend Department monitoring to double check possible impairment. 2012 data collected in drought year and high atmospheric temps. Should do follow-up monitoring
8/21/2019
Proposed
 
Monitor Water Quality or Sediment
GLPF2018_LM1802_ChlorideStudy
Date
Status
Chloride Impact Study for the Southeastern Wisconsin Region
6/1/2018
In Progress
Projects
 
Monitor Water Quality or Sediment
Spring Brook Temp
Date
Status
Need more data, was this instantaneous or continuous collection by volunteer or staff. AU: 896988; ID: 10030864
5/1/2018
Proposed
Projects
 
Monitor Water Quality or Sediment
Genesee Creek Temp
Date
Status
More data collect, continuous monitoring, biology not showing impairment. AU: 897102; ID: 683230
5/1/2018
Proposed
Projects
 
Monitor Water Quality or Sediment
Tichigan Creek Biology fIBI
Date
Status
Category 3 water with a single 'Poor' fIBI. Further monitoring recommended. AU: 897178; Station ID: 10041826
5/1/2018
Proposed
Projects
 
Rivers Planning Grant
SEWRPC SWEET Water Trust ARRA 18C Grant
Date
Status
Kinnickinnic River Watershed Restoration Plan for the Southeastern Wisconsin Watersheds Trust (SWWT). The consultant would also provide the information to Milwaukee Metropolitan Sewerage District to incorporate into their Kinnickinnic River Watercourse Flood Control Study.
10/1/2009
In Progress
Projects
Documents
 
Sewer Service Area Planning
SEWRPC WQM Planning, Grants support, TMDL work
Date
Status
sewrpc area WQM planning
12/31/2020
In Progress
Projects
 
Stormwater Planning, Implementation
Norway- In-Depth Water Quality Analysis & Stormwater Program
Date
Status
This project promotes nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated storm water management plan for part of the developed urban area; and an updated storm water management plan for new development.
1/1/2018
In Progress
Projects
 
Stormwater Planning, Implementation
River Hills - TMDL Storm Water Plan
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated construction erosion control ordinance; updated storm water ordinance for new development and re-development; updated storm water management plan for the entire developed urban area; and an updated storm water management plan for new development.
1/1/2018
In Progress
Projects
 
Stormwater Planning, Implementation
Targeted 9 Element I&E Program of SE WI Clean Water Network
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: a comprehensive storm water information and education program.
1/1/2018
In Progress
Projects
 
Stormwater Planning, Implementation
SW Management Plan Update & TMDL Analysis
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated storm water ordinance for new development and re-development; other new ordinances that affect runoff from the developed urban area; updated storm water management plan for the entire developed urban area; and an updated storm water management plan for new development.
1/1/2018
In Progress
Projects
 
Stormwater Planning, Implementation
Shorewood - TMDL Storm Water Plan
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated construction erosion control ordinance; updated storm water ordinance for new development and re-development; updated storm water management plan for the entire developed urban area; and an updated storm water management plan for new development.
1/1/2018
In Progress
Projects
 
Stormwater Planning, Implementation
SEWRPC Burlington Stormwater Study
Date
Status
This project promotes nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. The Southeastern Wisconsin Regional Planning Commission will conduct a storm water management study for the city of Burlington. The study shall identify the location and destination of current storm water flows, identify city and private property owners that have storm water capacity issues, and provide recommendations for eliminating flooding at the city's major businesses.
9/25/2017
In Progress
Projects
 
Stormwater Planning, Implementation
Greenfield City Wide Storm Water Quality Mgmt Plan Update
Date
Status
Storm water planning activities will be undertaken by the municipality and will result in the following products: updated construction erosion control ordinance, updated storm water ordinance for new development and re-development, updated low impact development/conservation subdivision ordinance, updated feasibility analysis of alternative funding mechanisms, updated storm water management plan for the developed urban area, and updated storm water management plan for new development.
1/1/2016
In Progress
Projects
Documents
 
Stormwater Planning, Implementation
Elkhorn Storm Water Management Plan
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated construction erosion control ordinance, updated storm water ordinance for new development and re-development, new ordinances that affect runoff from the developed urban area, new feasibility analysis of alternative funding mechanisms, new storm water management plan for the developed urban area, and updated storm water management plan for new development.
1/1/2016
In Progress
Projects
Documents
 
TMDL Development
Kinnickinnic TMDL
Date
Status
MMSD and Partners create TMDL for Watershed.
1/1/2010
In Progress
Projects
Documents
 
Water Quality Planning
AWQMP Program - SEWRPC
Date
Status
sewrpc program 2021
1/1/2021
In Progress
Projects
 
Watershed Mapping or Assessment
Education & Changing Behaviors in the Lower Fox River
Date
Status
The Fox-Wolf Watershed Alliance is sponsoring a project to increase public awareness of watershed function, ecosystem health, and non-point source pollution related to the Lower Fox River. Project final deliverables include: all data collected, agendas and minutes for planning meetings, newsletters and educational materials provided to the public. Specific project activities include: 1) Update and distribute the Erosion and Sediment Control Field Guide; 2) Update and distribute Responsible Construction brochure; 3) Explore the possibility of erosion control certification in NE WI; 4) Host a one day erosion control workshop for small-scale urbanized construction activities; 5) Host a 1.5 day Certified Inspector of Sediment and Erosion Control workshop; 6) Create a database for winter parking lot maintenance activities; 7) Develop an informational brochure or flier regarding winter parking lot and sidewalk maintenance; 8) Host a one-day workshop for winter parking lot and sidewalk maintenance; 9) Develop a planning document regarding stormwater control structures; 10) Create a database of stormwater control structure owners; 11) Develop and distribute educational material addressing stormwater structure inspections, maintenance and care; and 12) Host a one day workshop regarding stormwater control structures.
2/15/2017
In Progress
Projects
Documents
 
Middle Fox River - Illinois WatershedWatershed History Note

The community in the Middle Fox River Watershed known as Genesee Depot was settled predominantly by the English, Irish & Welsh and became a thriving settlement when the Milwaukee & Mississippi Railroad laid tracks through the area in 1851. Settler John Magee was instrumental in bringing the rail service to Genesee Depot after it was originally planned for the community of Genesee Village, but the asking price for land there was considered too high. Townspeople needed shipping facilities and once the rail service began, Genesee Depot became a “boom-town” of commercial activity, an agricultural service center, and caused Genesee Village to decline. In 1861 Patrick Lynch, a 35-year-old Irish immigrant, built the Union House Hotel, which maintained a prominent position within Genesee Depot. The establishment was open to village residents and visitors from Chicago and Milwaukee who wanted to spend time relaxing and enjoying the healthful spring waters in the area. The hotel was built in the 19th century’s fashionable Greek Revival architectural style and was the largest public building in the Depot. The building is still in use today as a wine shop and restaurant. By 1862, Benjamin Jenkins built a general store and warehouse and the post office also then moved. The growing area became known as Genesee Depot, and with many nearby dairy farms it became one of the largest milk shipping points in the nation, transporting 2-3 carloads of milk daily to Chicago, Milwaukee, and other points until 1908. By the 1890’s there was a grain elevator, slaughter house, two stores, blacksmith shop, shoe shop, woolen factory, post office, lumber yard, and train depot with ticket, baggage, and waiting rooms, storage buildings, and a platform where many went off to high school and Carroll College in Waukesha. Genesee’s original Town Hall, located on Hwy 83, was built in 1912 and is listed on the National Register of Historic Places. Genesee Depot is also the home of Ten Chimney’s, former residence of America’s most noted first couple of Broadway Theater, Alfred Lunt and Lynn Fontanne.

Date  2010